METRO Magazine Logo
MenuMENU
SearchSEARCH

DART shelters, stops equipped with solar lighting

Adding lighting at shelters and stops is expensive due to the high cost of electricity, construction costs and the periodic moving or removing of bus stops. These new solar-powered units provide a cost savings and they can be moved or relocated where they are the most effective.

May 21, 2009
DART shelters, stops equipped with solar lighting

 

2 min to read


[IMAGE]DART-stop-full.jpg[/IMAGE]In an effort to protect the environment and cut operating costs, Dallas Area Rapid Transit (DART) is equipping its new bus shelters and stops with solar-powered lighting.

The $8.5 million, five-year project, using a mix of 80 percent federal and 20 percent local funds, will install 177 energy efficient bus shelters annually.

Ad Loading...

DART is evaluating the success of an initial 78 solar-powered bus stops called I-STOPs. Offering security down-lighting, schedule illumination and a rider-signaling device, the new solar-powered light brings an increased feeling of safety and security to the rider experience. Another benefit is it allows bus operators to see customers at night, which reduces accidental bus pass-bys. 

Adding lighting at shelters and stops is expensive due to the high cost of electricity, construction costs, and the periodic moving or removing of bus stops, according to agency officials. These new solar-powered units provide a cost savings and they can be moved or relocated where they are the most effective.  

Currently, DART has installed solar-powered bus stops at Haskell and Live Oak, Second and Jefferson, and Northwest Highway at Pickwick. Three new solar-powered shelters with solar-powered lighting are at Clark and Clarkridge, Harry Hines Blvd. at Royal Lane, and Scyene at Buckner.

DART has roughly 13,000 bus stops throughout its 13 member cities. Approximately 700 have shelters. Every new shelter built by DART from now on will have solar lighting if tree canopy and other factors permit. DART is also retrofitting earlier shelters so that in five years most will be illuminated with solar power.

More Bus

Mayor Tim Keller in front of an ABQ RIDE microtransit vehicle
New Mobilityby StaffMay 12, 2026

ABQ RIDE Forward's Next Phase Sets Target Date

ABQ RIDE Forward is the first transit system overhaul in more than 25 years. This latest phase marks 15% completion of the 16-phase rollout, which will continue over the next several years.

Read More →
METRO Biz Briefs cover photo

STV Launches Power Practice and More in Biz Briefs

In METRO's latest installment, we take a look at the latest news from SilverRide, Complete Coach Works, and more.

Read More →
Cover for Part 2 with AC Transit's Cecil Blandon
ManagementMay 8, 2026

Bus Tech Talk: Part 2 with AC Transit's Cecil Blandon

In Part 2 of a two-part conversation, AC Transit’s director of maintenance joins co-hosts Alex Roman and Mark Hollenbeck to discuss his maintenance team’s work with various types of vehicle, training, augmented reality, and more.

Read More →
Ad Loading...
Maintenance officials examining a vehicle on a lift.
Managementby Alex RomanMay 8, 2026

Avoiding Mid-Season Breakdowns: A Fleet Readiness Q&A

John Hatman, COO of Master’s Transportation, breaks down the priorities, warning signs and common mistakes fleet managers should address now to stay ahead of summer demand.

Read More →
SEPTA's advertisement for multi-rider feature.
Technologyby StaffMay 7, 2026

Philadelphia's SEPTA Introduces Multi-Rider Feature for Contactless Payments

Up until now, this feature was only available when using a SEPTA Key card.

Read More →
Rendering of the upgraded Derby-Shelton Train Station
Busby StaffMay 4, 2026

CTDOT Launches Four-Station Upgrades on Waterbury Line

Construction on all four stations is beginning now and is anticipated to be completed by spring 2028.

Read More →
Ad Loading...
East Colfax BRT
Busby StaffMay 4, 2026

Denver RTD breaks ground on Aurora segment of East Colfax BRT

The beginning of the final BRT segment advances construction across all five segments, reflecting steady progress toward shorter travel times, improved accessibility, and a more dependable connection to jobs, businesses, and community destinations.

Read More →
A VIA bus
Busby StaffMay 1, 2026

San Antonio's VIA Launches Next Round of Bus Improvements

The changes are designed to reduce overall travel time, shorten wait times, and get customers to their destinations more quickly.

Read More →
Federal Reserve Bank visiting ENC
Busby StaffMay 1, 2026

Fed Leaders Highlight Growth, U.S. Manufacturing at ENC

The visit is part of the SF Fed's ongoing engagement with major employers and industries across Southern California and, more broadly, the western U.S. to better understand regional economic conditions and business outlooks.

Read More →
Ad Loading...
A person working on a bus
ManagementMay 1, 2026

Data-Driven Maintenance: Focusing Effort Where It Matters Most

Advances in data and analytics are giving transit agencies new opportunities to refine maintenance practices, improve efficiency and make more informed decisions about asset performance.

Read More →