METRO Magazine Logo
MenuMENU
SearchSEARCH

DCTA signs $73M contract for 11 Stadler DMUs

A-train project includes single-phase construction of 21 miles of regional rail, five rail stations, a bicycle/pedestrian trail, and a regional rail operating and maintenance facility.

May 22, 2009
DCTA signs $73M contract for 11 Stadler DMUs

 

2 min to read


[IMAGE]DCTA-train-full.jpg[/IMAGE]The Denton County (Texas) Transportation Authority (DCTA) and Stadler Bussnag AG, a Swiss company, have reached an agreement for the purchase of eleven GTW 2-6 Diesel Multiple Units (DMU) for use as the next generation rail fleet for DCTA’s 21-mile corridor from Denton to Carrollton.

Jim Witt, DCTA president and Klaus Potocnik, head of project management/deputy CEO signed the $73.7 million contract on Tuesday. Vehicle construction will commence in September 2010 and the first vehicle is schedule to arrive in Lewisville in August 2011. The final vehicle is scheduled for delivery in April 2012. Testing will continue through August 2012 with “fleet transition” scheduled for September of 2012.

Ad Loading...

Each GTW 2/6 can seat 96 passengers and has a total capacity of 200. Luggage racks, bike racks and space for wheelchairs are provided. The vehicle is 70 percent low floor, meaning level boarding is provided. Though up to three vehicles may be run as a unit, DCTA plans to run two coupled vehicles on 20-minute headways during peak service.

A central element of DCTA’s service plan and heavily endorsed by Denton County residents, the A-train project includes single-phase construction of 21 miles of regional rail, five rail stations, a bicycle/pedestrian trail, and a regional rail operating and maintenance facility. 

The immediate objective of the project is to have full service between Denton and Carrollton to interface with Dallas Area Rapid Transit’s light rail system by December 2010. This timing will coincide with DART’s opening of the northern section of its Green Line and will complete a 50-mile segment of regional passenger rail that is detailed in the Mobility 2030 plan.

The A-train is slated to begin service using RDC vehicles which were previously operated by the Trinity Railway Express (TRE). The Stadler DMUs or “new generation vehicles” are expected to go into operation after approximately eighteen months of the A-train being in service.

More Rail

An Amtrak Acela train at New York Penn Station
Railby StaffMarch 24, 2026

Transportation Secretary Duffy, Amtrak Announce Progress on New York Penn Station Project

As part of the contract, the AECOM-LiRo NYPennT Joint Venture will work with Amtrak and the selected Master Developer to completely transform Penn Station, improving safety and operational efficiency, making the system more family-friendly, accommodating increased train and passenger capacity, and delivering a world-class experience to its growing passenger base, according to Amtrak officials.

Read More →
A screenshot of ZeroEyes AI gun detection technology.
Railby Staff and News ReportsMarch 24, 2026

ZeroEyes Launches ZeroLink to Expand AI Gun Detection Beyond Traditional Networks

New edge-based solution enables real-time threat detection and situational awareness in remote, mobile, and infrastructure-limited environments.

Read More →
A Chicago rail and rail car in the city.
Railby Staff and News ReportsMarch 23, 2026

Chicago Transit Authority Sues USDOT Over Paused Funding for Red Line Extension, Modernization Projects

The Chicago agency seeks restoration of nearly $2 billion in federal funding, warning halted projects could impact transit access and economic growth.

Read More →
Ad Loading...
GO Transit railcars
Railby StaffMarch 20, 2026

Alstom Awarded 5-Year Extension for GO Transit, UP Express Services

Company officials said that this latest contract extension with Metrolinx consolidates the company’s position as the leading private provider of Operations and maintenance services in North America.

Read More →
A New York MTA subway car with an open gangway
Railby StaffMarch 20, 2026

New York MTA Seeks Bids for 2,390 Subway Cars in Record-Breaking Order

The new cars, model R262, will be funded by the MTA’s 2025-29 Capital Plan, which received a historic $68 billion in funding from Governor Hochul and the State Legislature in the FY26 Enacted State Budget.

Read More →
Graphic from Amtrak promoting the B&P Tunnel Replacement and Frederick Douglass Tunnel project, featuring the Amtrak logo, project title and an illustration of a high-speed train near the West Baltimore MARC Station.
Railby News/Media ReleaseMarch 17, 2026

Amtrak Announces Community Grants for Projects Near Baltimore’s New Frederick Douglass Tunnel

Amtrak will open grant applications March 23 for community projects near the Frederick Douglass Tunnel alignment in Baltimore as part of a $50 million investment tied to the B&P Tunnel Replacement Program.

Read More →
Ad Loading...
Amtrak train with logo
Railby StaffMarch 16, 2026

Amtrak Marks Restoration of Two South Carolina Stations

The Denmark Station $2.3 million construction investment project includes a new 280-foot concrete boarding platform, built eight inches above the top of rail, for improved accessibility for passengers with disabilities and families with small children and much more.

Read More →
A view looking down the rail across the new Portal North Bridge.
Railby Staff and News ReportsMarch 13, 2026

NJ Transit, Amtrak Prepare to Open First Track on New Portal North Bridge

The new bridge will begin carrying passenger trains on March 16, replacing a 116-year-old swing bridge that has long caused delays.

Read More →
Caltrain trains on tracks
Railby StaffMarch 6, 2026

Caltrain Adopts Corridor-Wide Right-of-Way Safety Strategy

Caltrain and its partners have implemented safety improvements at specific locations in response to known risk conditions, operational needs, and available funding since the agency’s founding.

Read More →
Ad Loading...
A photo of rail tracks in Ottawa, Canada

Building a National Framework for Transit Safety and Consistency

On a recent episode of METROspectives, METRO Magazine’s Executive Editor Alex Roman sat down with Ana-Maria Tomlinson, Director of Strategic & Cross-Sector Programs at the CSA Group, to explore a bold initiative aimed at addressing those challenges: the development of a National Code for Transit and Passenger Rail Systems in Canada.

Read More →