FRA proposes emergency reporting system requirement
Proposal would require railroads to post a toll-free telephone number and the DOT’s National Crossing Inventory identification number at every highway-rail crossing and explicitly authorized pathway grade crossing.
The Federal Railroad Administration (FRA) on Thursday proposed a rule that would make it easier for the public to report unsafe conditions at highway-rail grade crossings. The proposal would require railroads to establish toll-free telephone numbers to allow the public to report malfunctioning highway-rail grade crossing warning signals, disabled vehicles blocking crossings or any other unsafe conditions at crossings.
Under the proposed rule, once the railroad receives a call from the public about a malfunctioning crossing signal or a vehicle stalled on the crossing, train operators in that area would be immediately notified of the unsafe condition in an effort to avoid an accident.
“Giving the public the power to report unsafe conditions at a highway-rail grade crossing can save lives,” said U.S. Transportation Secretary Ray LaHood.
The proposal to establish Emergency Notification Systems would require railroads to post a toll-free telephone number and the U.S. Department of Transportation’s National Crossing Inventory identification number at every highway-rail crossing and explicitly authorized pathway grade crossing.
Currently, all of the larger, Class I freight railroads and larger passenger railroads have some type of system in place by which they receive notification of unsafe conditions at grade crossings. However, not all smaller railroads have such a system in place. Based on National Crossing Inventory data from the end of December 2009, the proposed rule would affect 211,401 highway-rail and pathway grade crossings and 594 railroads.
“With a uniform emergency notification system all railroads must follow, we could cut the number of highway-rail crossing incidents,” said Federal Railroad Administrator Joseph C. Szabo. “Standardization would simplify the process for both the public and railroads, saving precious time and lives.”
The proposed rule is required by the Rail Safety Improvement Act of 2008, and was developed following public outreach efforts by FRA. The Notice of Proposed Rulemaking is available here. Comment is due 60 days after the proposal’s publication in the Federal Register.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →