METRO Magazine Logo
MenuMENU
SearchSEARCH

D.C. Metro unveils track geometry vehicle

The specialized railcar, custom-built by Ensco, is equipped with advanced technology that analyzes the condition of rail and track infrastructure and alerts Metro to potential defects.

July 10, 2012
2 min to read


Washington Metropolitan Area Transit Agency (Metro) accepted delivery of its first track geometry vehicle (TGV), a specialized railcar equipped with advanced technology that analyzes the condition of rail and track infrastructure and alerts Metro to potential defects.

The TGV, built by Falls Church, Va.-based Ensco Inc., gives Metro in-house capability to inspect track with greater speed and efficiency and detect track anomalies before they have an impact on service.

“Ultrasonic and geometry testing can be performed to assist in managing maintenance needs and advance identification of ‘trouble spots’ to improve reliability of service and limit disruptions,” said Tom Robinson, Metro’s Deputy Chief Engineer Track and Structures.

The TGV will assist Metro in the detection of track conditions that ultimately can become cracked rails.

Previously, track tests were contracted to third parties and performed only during non-revenue hours using a standard ultrasound technology. The TGV will allow for testing during both non-revenue and operating hours, providing greater flexibility in use of the vehicle and cost savings to Metro. In addition, the TGV features multi-dimensional analysis capabilities, beyond ultrasound, including the ability to:

•    Measure rail geometry, rail profile, platform edges and third rail temperatures

•    Perform ultrasonic rail flaw inspections

•    Record video of track beds and tunnels

•    Utilize infrared video to identify hot third-rail components

•    Travel and perform some testing at speeds up to 60 mph

Metro’s TGV was custom-built for the agency’s needs, and boasts the largest number of inspection systems integrated into a single vehicle built by Ensco to date.

The TGV will undergo a period of calibration and testing before entering service later this year.

More Rail

Two Metra locomotives on rail tracks.
Rail•by Alex Roman•October 29, 2026

Metra Draft Plan Outlines Costs, Service Improvements for Regional Rail

The Systemwide Network Plan identifies infrastructure needs and potential investments to expand all-day, bidirectional rail service across the Chicago region.

Read More →
METRO Magazine graphic featuring railroad tracks and switches inside a dark tunnel with the headline “Amtrak Completes First Street Tunnel Upgrades, Restores Service.”
Rail•by Elora Haynes•October 29, 2026

Amtrak Completes First Street Tunnel Upgrades, Restores Service

The nine-day construction project included replacing aging track infrastructure and modernizing switch systems near Washington Union Station.

Read More →
FRA Invests $2.3B in Rail Projects Nationwide
Rail•by Alex Roman•October 28, 2026

FRA Announces $2.3B for Passenger, Freight Rail Projects Nationwide

The CRISI Grant Program funding will support rail infrastructure improvements, safety upgrades, and projects aimed at improving freight and passenger rail service across 45 states and Washington, D.C.

Read More →
Ad Loading...
A Caltrain electric railcar on the tracks
Rail•by Alex Roman•October 27, 2026

Caltrain’s Electrification Drives a New Era of Ridership Growth

The railroad’s shift to electric service has brought more frequent trains, stronger customer satisfaction, and increased ridership, earning it APTA’s Outstanding Public Transportation System award.

Read More →
METRO Magazine graphic featuring a dark blue background with abstract curved lines and the headline “FTA Advances $164M Broward County Commuter Rail Project.”
Rail•by Staff and News Reports•October 26, 2026

FTA Advances $164M Broward County Commuter Rail Project

The proposed 10.5-mile commuter rail extension would connect Fort Lauderdale and Aventura, expanding passenger rail options in South Florida.

Read More →
An A line MTA subway car near the soon to be replaced signaling system.
Rail•by Staff and News Reports•October 23, 2026

New York MTA Launches Historic $1.9B Signal, Track Modernization Project

Funded in part by congestion pricing revenue, the project will replace nearly century-old signals along the A and C lines in Brooklyn and Queens.

Read More →
Ad Loading...
The LA Metro San Fernando Valley light rail extension corridor
Rail•by Alex Roman•October 20, 2026

LA Metro Breaks Ground on East San Fernando Valley Light Rail Project

The 6.7-mile line will add 11 stations along Van Nuys Boulevard, expand access to jobs and regional transit connections, and support Metro’s broader efforts to improve mobility as rail ridership grows.

Read More →
New Standard Helps Transit Agencies Address Climate Risks
Security and Safety•by Alex Roman•October 19, 2026

CSA Group Releases Climate Resilience Standard for Transit, Passenger Rail

Developed with support from the Standards Council of Canada, CSA D700 guides assessing climate-related risks and planning adaptation measures for transit and passenger rail systems.

Read More →
Crowd waiting for LA Metro bus
Management•by Staff and News Reports•October 16, 2026

LA Metro September Ridership Climbs 3.9%, Led by Rail Growth

The agency recorded more than 27.2 million boardings, with rail ridership increasing 12.4% year over year and the D Line posting the largest gains.

Read More →
Ad Loading...
METRO Magazine graphic featuring an aerial view of MetroLink extension construction, with the headline “MetroLink Expansion Completed With $192M Airport Project.”
Rail•by Staff and News Reports•October 14, 2026

First Full MetroLink Rail Expansion Completed in 20 Years with $192M Airport Project

The project links two St. Louis-area airports by light rail while adding roadway and bike trail connections to improve regional access and mobility.

Read More →