Bus

Community Transit to launch hybrid BRT service

Posted on November 10, 2009 by METRO Staff

In November, Snohomish County, Wash.-based Community Transit will launch Swift, the state's first bus rapid transit (BRT) line, with a free public event.

"Swift has a very strong brand that will set it apart from other buses in our area," said Martin Munguia, public information officer at Community Transit. "The buses and the stations look very different, and are easily identifiable by the bold Swift logo."

Because Everett Transit only serves residents to the city line, the new BRT line will bridge transit service across Everett and south Snohomish County, eliminating an intersection where riders literally have to get off one bus, cross the street and get on another bus.

The Swift line will feature 62-foot New Flyer BRT hybrid buses equipped with three doors, the back two of which are plug doors, enabling extra width for simultaneous boarding and de-boarding, explained Munguia.

Meanwhile, a ramp at the front door is for passengers in wheelchairs or mobility devices. In the front securement area there are two standard forward-facing wheelchair wells where passengers can be secured with assistance from the driver. Also in this area are two rear-facing passive restraint boards, where wheelchair passengers can back up to, lock their brake and lower an armrest. These spaces require no driver assistance and are much quicker for passenger boarding.                    

In anticipation for the line's launch, which will include guest speakers, entertainment, information booths and refreshments, Community Transit will host several public outreach events where staff will be handing out special promotional scratch tickets that will enable winners to take a ride aboard one of the Swift buses to the public launch celebration.

The new hybrid buses will run every 10 minutes from 5 a.m. to 7 p.m. on weekdays and every 20 minutes from 7 p.m. to midnight weekdays and from 6 a.m. to midnight on weekends. Buses will travel a 17-mile route between Everett Station and the Aurora Village Transit Center in Shoreline, primarily along Highway 99.

The line will only stop at Swift stations that have been constructed along the route. There are 24 Swift stations, and buses will only make 12 stops in each direction.

Additionally, passengers will not pay their fare onboard Swift, instead using ticket vending machines or ORCA smart-card readers located at the stations to pre-pay before boarding. Bike racks are also located onboard the Swift buses.

"Seven miles of the route in south Snohomish County have transit lanes, which are reserved for buses or cars making right-hand turns. The City of Everett is exploring the feasibility of transit lanes in the northern part of the route," added Munguia. "Also, 10 miles of the route are equipped with transit signal priority (TSP) technology, enabling a longer green light for an approaching Swift bus. The remainder of the route will have working TSP within a year."

The construction of the Swift line came in at $29.5 million - $2.5 million under budget. Fifty percent of Community Transit's capital costs - buses and stations - are funded through a combination of state and federal grants and a partnership with Everett, while more than 90 percent of the operating costs for the first three years of service (2010-12) will be paid by state grants, partnerships and fares. All of this adds up to good news for Community Transit since, like most agencies, it is suffering from funding issues.

"Without this arrangement, it would have been nearly impossible for us to launch this new service at this time," added Munguia.

 

View comments or post a comment on this story. (0 Comments)

More News

Chinese company unveils 'Transit Elevated Bus'

The bus is supported by two legs that run along rails laid along the roadside. The legs allow the buses frame to glide high above the gridlock at speeds of up to approximately 37 miles per hour.

Last Chance for Innovative Solutions Award submissions

Have you recently partnered with a solutions provider within the last year to implement a new innovation at your operation that has helped you save money, run more efficiently, streamline operations, improved customer satisfaction or increased ridership? Tell us what you did and how it has positively impacted your business.

NY MTA introduces the first of more than 2,000 state-of-the-art buses

After more than three decades of bearing more than a passing resemblance to refrigerators on wheels, the appearance of North America’s largest transit bus fleet is undergoing a stunning transformation

NY MTA rolls out first of 75 state-of-the-art New Flyer buses

In March, Gov. Cuomo announced the addition of 2,042 buses, equipped with Wi-Fi and USB charging ports, to the MTA fleet over the next five years, replacing 40% of the current fleet.

Dallas' DART takes top spot at APTA's International Bus Roadeo

The Grand Champion Award recognizes the system with the highest combined bus operator and maintenance team score.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close