Bus

L.A. Metro completes transit solar panel installation

Posted on April 27, 2009

[IMAGE]METRO-solar-panels-full.jpg[/IMAGE]The Los Angeles County Metropolitan Transportation Authority (Metro) unveiled a groundbreaking energy efficiency and renewable power project with the installation of the nation’s largest solar panel system at a transit facility. It is also the largest solar panel installation within the City of Los Angeles.

 

The project is a Public-Private partnership between Metro and Chevron Energy Solutions. The $16.5 million project will receive about $6.3 million in incentives from the Los Angeles Department of Water and Power (LADWP), Southern California Gas Co., (SoCalGas) and the South Coast Air Quality Management District. 

 

The 6,720 individual solar panels at Metro’s Support Services Center in downtown Los Angeles — Metro’s central maintenance facility for buses — will generate 1.2 megawatt, or 1,200 kilowatts of renewable, emission-free power. Along with other energy-efficient improvements, the project is expected to cut the facility’s annual $1.1 million energy bill in half to approximately $550,000.

 

Metro will reduce its purchase of utility power, which is anticipated to reduce carbon emissions by more than 3,700 metric tons, equivalent to planting more than 550 acres of trees and taking more than 600 cars off the road.

 

“Los Angeles is now one step closer to becoming the solar capital of the United States," said Los Angeles Mayor and Metro Board Chair Antonio Villaraigosa. "Today's unveiling of the city's largest solar-powered facility will not only generate clean, renewable energy, but will provide the kinds of green jobs that this economy so desperately needs."

 

California-based Chevron Energy Solutions, which designed and installed the solar photovoltaic system, will provide long-term oversight of the facility’s solar panel array and related new equipment and, in addition, will guarantee the energy savings and the level of energy generated by the solar panel array for the next 10 years.

 

Other energy conservation measures at the facility include the installation of new heating, ventilation and air conditioning (HVAC) systems, compressed air systems, and the replacement of about 4,000 lighting fixtures, all controlled by a state-of-the-art energy management system.

 

View comments or post a comment on this story. (0 Comments)

More News

Albuquerque BRT project exploring full sponsorship

ABQ RIDE is looking to model its plan after the Greater Cleveland Regional Transit Authority’s HealthLine, which is sponsored through a hospital partnership. Construction on the so-called ART system could begin in May 2016 with an in-service date of September 2017.

New luxury bus service launches in San Francisco

The service, which costs $6 a ride, asks riders to download the Leap app, creating an account, uploading a photo and adding a credit card that enables them to pay via a QR code.

4ONE wins multiple bus seating orders

Agencies ordering the company's products, which are now in at least half of all new U.S. and Canadian transit buses, include L.A. Metro, Chicago Transit Authority and New York City Transit.

New Flyer awarded big Las Vegas CNG bus contract

The contract includes a firm order for 35 XN40 and 20 XN60 Xcelsior buses, with an option for another 150 XN40 and 100 XN60 over the next five years. All buses are to be powered by CNG.

Pierce Transit taps Apollo for video surveillance

The decision comes after the agency conducted an analysis and product review period. Implementation of the project began in February and all work is expected to be completed by the end of April.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close