Bus

Butler Transit facility receives funding

Posted on May 8, 2009

[IMAGE]Butler-facility-full.jpg[/IMAGE]Pennsylvania Department of Transportation announced Wednesday, that the Butler Transit Authority’s (BTA) Transit Center is among the transit projects in Pennsylvania funded in part with the American Recovery and Reinvestment Act funds. BTA was placed on Penn DOT’s “wish list” of transit projects in January 2009.

The transit authority will receive $5,340,569 to complete phase I of its Transit Center. Located in Butler’s Pullman Center Redevelopment area, BTA’s Transit Center will begin construction in the fall of 2009.

Phase I of the facility will consist of a 7,000-square-foot office building and a maintenance and wash bay building, as well as a storage area for the Authority’s buses and Butler County’s Butler Area Rural Transit (BART) shared-ride buses.

Phase II of the facility will encompass the enclosure of the storage area, construction of a wait area for interconnectivity with local transit and planned commuter service and park-n-ride.

The new facility will be the first transit center in the state of Pennsylvania to be LEED certified. It will receive a Silver LEED Certification for use of geothermal heating and cooling as well as other energy conservation and environmental friendly principals.

The design will reduce the authority’s future operating costs by 20 percent to 25 percent. The green building principals will reduce energy costs by 50 percent.

For up‐to‐date information on this project and others, visit www.butlertransitauthority.com.

View comments or post a comment on this story. (0 Comments)

More News

Man charged with murder after stabbing Winnipeg Transit bus driver

The incident occurred at 2 a.m., when the driver pulled up to the last stop of his shift and asked the man to leave the bus. After a physical altercation, which ended up outside the bus, ensued, the driver was stabbed multiple times.

N.Y.'s NICE to add 33 New Flyer buses

Twenty-eight 40-foot buses will replace existing buses in the NICE fleet that have reached the end of their useful life, while five 60-foot buses will be used on the customer's new bus rapid transit line, scheduled to start service in 2017.

Nova Bus, ABB partner for electric bus, charger delivery to N. America

The ABB DC fast charger, with the associated systems, is based on the common interface, which allows charging stations and electrified buses from different manufacturers to be used together.

Proterra names Horton to CCO post

Will lead the end-to-end customer lifecycle as Proterra triples production and initiates large-scale deployments across North America.

Stertil-Koni adds new capabilities to transmission jack

The battery-operated jack can be charged overnight and used without cables. The pneumatic jack has an attached air hose to keep it working. Previously, transmission jacks were manually hand-pumped, much like a car jack.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close