Bus

Calif. transit receives $2.77M for BRT

Posted on December 22, 2009

Last week, President Barack Obama signed the Consolidated Appropriations Act of 2010 (House Resolution 3288). Within the bill was a $2.77 million appropriation for Monterey-Salinas Transit (MST) for its bus rapid transit (BRT) program on the Monterey Peninsula.

 

The $2.77 million in federal funding will be matched by $700,000 in California Proposition 1B Transportation Bond funds, which were approved state-wide by voters in 2006. The nearly $3.5 million project will fund improvements along the Fremont/Lighthouse corridor, including new shelters, “smart” signals at intersections that will be coordinated along the corridor to improve traffic flow, curb expansions, sidewalk improvements and wheelchair accessible ramps at bus stops, and electronic real-time bus arrival/departure signs connected to MST vehicles via Global Positioning System (GPS).

 

Coupled with these infrastructure improvements will be enhancements to the operations and scheduling of the transit lines that serve the Fremont/Lighthouse corridor. What is now a nearly one hour trip from residential areas in upper Seaside to work locations on Cannery Row and the Monterey Bay Aquarium on two buses with a transfer in downtown Monterey will be replaced with a quicker “one-seat-ride” on a single BRT vehicle.

 

MST’s BRT project was awarded funding by the Obama Administration based on its ability to meet or exceed certain metrics and performance measures required by the Department of Transportation’s Very Small Starts transit capital improvement program targeted for projects totaling less than $25 million. With project funding now in place, MST will be working in the coming year with design and engineering consultants to finalize plans for the BRT system.

 

View comments or post a comment on this story. (0 Comments)

More News

2,627 complaints lodged on Fla.'s HART bus system

The unedited complaints represent only one side of the story and often are fired off by people who are upset. HART says its own GPS and video technology shows many are plain wrong. The agency relies upon the list to target areas of customer service that are in need of improvement.

CHK America wins bus stop improvement contract for GRTC

The three-tiered project will include redesigning the information for more than 2,000 stops throughout the Greater RIchmond Transit Company's service area.

Connecticut's CTfastrak BRT system begins service

The CTfastrak transit system provides direct service to and from Waterbury, Cheshire, Southington, Bristol, Plainville, New Britain, Newington, West Hartford, Hartford, East Hartford and Manchester with routes that take advantage of the bus-only CTfastrak roadway.

Albuquerque BRT project exploring full sponsorship

ABQ RIDE is looking to model its plan after the Greater Cleveland Regional Transit Authority’s HealthLine, which is sponsored through a hospital partnership. Construction on the so-called ART system could begin in May 2016 with an in-service date of September 2017.

New luxury bus service launches in San Francisco

The service, which costs $6 a ride, asks riders to download the Leap app, creating an account, uploading a photo and adding a credit card that enables them to pay via a QR code.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The resource for managers of class 1-7 truck Fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close