Bus

Calif.’s Big Blue to begin bus stop redevelopment

Posted on January 21, 2010

[IMAGE]BBB-Bus-Stop-Rendering-full-1.jpg[/IMAGE]Following City Council approval on Tuesday, Santa Monica, Calif.’s Big Blue Bus announced it is ready to begin the next phase of its bus stop redevelopment project, which will eventually replace or enhance all 360 bus stops around the city. The agency’s goal is to have the first new stops in place by December 2010.

 

The proposed new stops will include a contemporary and creative design that utilizes sustainable materials, passenger-friendly maps and timetables, and improved amenities to enhance the rider experience. All stops will also be equipped with GPS-based technology to provide different kinds of real-time schedule information to waiting passengers.

 

Los Angeles design firm Lorcan O’Herlihy Architects (LOHA) was selected from among several top architectural firms to design the project. LOHA’s Santa Monica-inspired conceptual design, called “The Blue Spots,” is clean and unobtrusive, and was designed to enhance the city’s ambiance. The structures will be flexible and able to adapt to various sized locations around the city.

 

All of the new stops will feature:

 

  • A simplified Big Blue Bus system map.
  • A localized map showing areas within walking or biking distance.
  • A listing of all bus lines that use that stop.
  • A timetable and route map of lines stopping at that location.
  • Estimated travel times to key points along the route.
  • An ID number that will allow riders to access next bus arrival information via cell phone.
  • A shelter canopy.

 In addition, locations with medium and high volume rider patterns will also receive:

 

  • Signs that broadcast real time bus arrival information
    .
  • Seating (select low volume stops may also receive seating)
  • Trash and recycling containers
    .
  • Lighting that illuminates the structure and waiting area.

The project has been budgeted at $6.9 million, with $3 million coming from Federal Transit Administration funds and nearly $2.5 coming from stimulus funds. The Big Blue Bus will provide the remaining funding.

 

 

View comments or post a comment on this story. (0 Comments)

More News

UTA takes delivery of Provo/Orem BRT bus

The New Flyer Xcelsior 60-foot articulated bus is the first to be delivered and will now go through a thorough testing process.

FTA makes $226M in grants available to improve transit bus service

All projects must comply with Buy America regulations, which require that all iron, steel, or manufactured products be produced in the U.S., as well as final assembly of vehicles.

WSP USA designing BRT system for TriMet

The 14-mile Division Transit Project will provide an improved high-capacity connection between downtown Portland and the City of Gresham via Division Street.

New Flyer to supply 14 60-foot articulated buses to Brampton Transit

The vehicles will be delivered starting Q1 2018.

Valley Metro to add 187 ElDorado, New Flyer buses

All vehicles are funded by Federal Transit Administration and a half-cent sales tax that funds the Regional Transportation Plan in Maricopa County, which was approved by voters in 2004.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close