Bus

Calif.’s Big Blue Bus honored for shelter design

Posted on January 6, 2011

[IMAGE]BBB-LOHA-Bus-Stop-Prog-Rendering-6.jpg[/IMAGE] The Los Angeles chapter of the American Institute of Architects (AIA) awarded its "Next LA" Citation Award for Architecture to the new Big Blue Bus shelter and bus stop redevelopment program. The award honors excellence in design by Los Angeles architects for projects not yet built.

"This is a very meaningful award, especially because one of the goals for this project was to create something totally unique," said Dan Dawson, customer relations manager for the Big Blue Bus. "These new stops will make riding public transit a better experience by offering passengers a whole new level of enhanced information and comfort."

Lorcan O'Herlihy Architects (LOHA) was chosen to work with Big Blue Bus and city staff to come up with a Santa Monica-inspired design that would also incorporate real-time information, solar lighting, updated maps and other desired amenities for riders. The final design, called "The Blue Spots," is clean and unobtrusive, and was designed to enhance the city's coastal look and feel. The new bus stop structures will utilize a modular system flexible enough to adapt to various sized locations and rider volumes.

As part of LOHA's research, each stop's unique orientation was carefully analyzed so seating could be positioned for maximum sun protection for waiting passengers. Since the shelters will utilize slender poles instead of the typical multiple sided structures found at most stops, passengers requiring special access, such as wheelchairs, will find the stops very easy to use. Businesses located near the bus stops will also benefit from the minimal structures, as store windows and signage will not be blocked.

All 360 bus stops throughout Santa Monica, and various other stops located around Los Angeles serviced by the Big Blue Bus, will be updated. New features at each stop will include:

  • A Big Blue Bus system map.
  • A local map showing places to visit within walking or biking distance.
  • A timetable and route map of lines stopping at that location.
  • Estimated travel times to key points along the route.
  • An ID number that allows for real time bus arrivals via cell phone.
  • A shelter canopy.

Medium and high volume stops will also receive:

  • Signs that broadcast real time bus arrival information
  • Seating (select low volume stops may also receive seating).
  • Trash and recycling containers.
  • Solar LED lighting that illuminates the structure and waiting area.

In keeping with the city of Santa Monica's commitment to a cleaner environment, the new stops will be fabricated with recycled and locally sourced materials wherever possible. Federal Transit Administration and stimulus funds were the primary sources of funding for the project's $6.9 million budget.

Construction of the new stops is expected to begin during the first quarter of 2011.

 

View comments or post a comment on this story. (0 Comments)

More News

Albuquerque BRT project exploring full sponsorship

ABQ RIDE is looking to model its plan after the Greater Cleveland Regional Transit Authority’s HealthLine, which is sponsored through a hospital partnership. Construction on the so-called ART system could begin in May 2016 with an in-service date of September 2017.

New luxury bus service launches in San Francisco

The service, which costs $6 a ride, asks riders to download the Leap app, creating an account, uploading a photo and adding a credit card that enables them to pay via a QR code.

4ONE wins multiple bus seating orders

Agencies ordering the company's products, which are now in at least half of all new U.S. and Canadian transit buses, include L.A. Metro, Chicago Transit Authority and New York City Transit.

New Flyer awarded big Las Vegas CNG bus contract

The contract includes a firm order for 35 XN40 and 20 XN60 Xcelsior buses, with an option for another 150 XN40 and 100 XN60 over the next five years. All buses are to be powered by CNG.

Pierce Transit taps Apollo for video surveillance

The decision comes after the agency conducted an analysis and product review period. Implementation of the project began in February and all work is expected to be completed by the end of April.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close