Bus

Monterey, Calif., partners with music festival to launch BRT

Posted on September 7, 2011

Monterey-Salinas Transit (MST) is partnering with the Monterey Jazz Festival to launch its bus rapid transit (BRT) service in Monterey County in the fall of 2012.

This new service will not only decrease travel times by as much as 25 percent along one of the busiest traffic corridors on the Monterey Peninsula, but also will provide an entertaining and educational history of the Monterey Jazz Festival at the same time.

Aptly named “JAZZ,” the new 6.75-mile BRT service will start at Sand City Station located at the Edgewater Shopping Center in Sand City, run along Fremont in Seaside and North Monterey, continue through downtown Monterey and along the visitor-intensive Lighthouse Avenue corridor in New Monterey, and turn around for a return trip near the Monterey Bay Aquarium.

The BRT service will introduce new technologies that include queue jump lanes, transit signal priority (TSP) and increased stop spacing to streamline bus traffic along the corridor and significantly reduce travel times. The new shelters will offer global positioning system (GPS)-enabled electronic passenger information signage and other enhanced amenities as well as minimal curb and sidewalk improvements to ensure that all stop locations meet federally-mandated Americans with Disabilities Act requirements.

Pavement at stops and at the new queue jump locations will be upgraded to accommodate BRT operations and redesigned to provide a unique, decorative flair to match the new JAZZ design and color scheme. The low-floor buses that MST will operate on the BRT corridor are already TSP-enabled and will be repainted to reflect the JAZZ brand image of the new service.

A sample shelter will be on display within the Monterey County Fairgrounds at this year’s Monterey Jazz Festival, which takes place Sept. 16 to 18. The full system is slated for completion in time for the 55th Annual Monterey Jazz Festival in September of 2012.

In late 2009, MST received approximately $2.7 million in Small Starts program funds from the Federal Transit Administration to fully fund the project, along with $700,000 in state transportation bonds.

View comments or post a comment on this story. (0 Comments)

More News

UTA takes delivery of Provo/Orem BRT bus

The New Flyer Xcelsior 60-foot articulated bus is the first to be delivered and will now go through a thorough testing process.

FTA makes $226M in grants available to improve transit bus service

All projects must comply with Buy America regulations, which require that all iron, steel, or manufactured products be produced in the U.S., as well as final assembly of vehicles.

WSP USA designing BRT system for TriMet

The 14-mile Division Transit Project will provide an improved high-capacity connection between downtown Portland and the City of Gresham via Division Street.

New Flyer to supply 14 60-foot articulated buses to Brampton Transit

The vehicles will be delivered starting Q1 2018.

Valley Metro to add 187 ElDorado, New Flyer buses

All vehicles are funded by Federal Transit Administration and a half-cent sales tax that funds the Regional Transportation Plan in Maricopa County, which was approved by voters in 2004.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close