Bus

Conn. BRT project awarded $275M

Posted on November 21, 2011

The Federal Transit Administration (FTA) reached an agreement with the Connecticut Department of Transportation to provide $275.3 million to help build the New Britain-Hartford Busway — Connecticut's first bus rapid transit (BRT) system.

FTA Administrator Peter Rogoff signed the full-funding grant agreement during a ceremony at Central Connecticut State University in New Britain. The grant clears the way for the Connecticut DOT to begin construction of the bus rapid transit system and covers about half the total cost of the $567 million project.

Riders will be able to board the buses at several stations, and then bypass traffic on I-84 by traveling along exclusive bus lanes to destinations in downtown New Britain and Hartford. The project, which will take roughly two years to complete, is expected to create more than 4,000 construction-related jobs and 100 permanent jobs.

The busway will operate within an exclusive roadway along a 9.4-mile abandoned railroad right-of-way between downtown New Britain and downtown Hartford. The project will offer 11 stations; park and ride connections to other suburban transit service; and 31 new clean fuel buses, which will serve the communities of New Britain, Newington, West Hartford and Hartford, and connect to Amtrak intercity rail service at Hartford's Union Station.

Residents in surrounding communities will have many options to connect to the busway, including commuter express, shuttle, circulator and feeder bus services. In addition, a multi-use trail will be constructed near the busway along a five-mile stretch between downtown New Britain and Newington, providing pedestrian and bicycle access at five stations.

 

View comments or post a comment on this story. (0 Comments)

More News

Calif. Gov. commemorates new Proterra LA manufacturing facility

Partially funded by a grant from the California Energy Commission, the 100,000-square-foot facility has the capacity to manufacture 400 buses annually.

UTA takes delivery of Provo/Orem BRT bus

The New Flyer Xcelsior 60-foot articulated bus is the first to be delivered and will now go through a thorough testing process.

FTA makes $226M in grants available to improve transit bus service

All projects must comply with Buy America regulations, which require that all iron, steel, or manufactured products be produced in the U.S., as well as final assembly of vehicles.

WSP USA designing BRT system for TriMet

The 14-mile Division Transit Project will provide an improved high-capacity connection between downtown Portland and the City of Gresham via Division Street.

New Flyer to supply 14 60-foot articulated buses to Brampton Transit

The vehicles will be delivered starting Q1 2018.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close