Bus

FTA awards Cap Metro $38M for BRT system

Posted on April 11, 2012

The Federal Transit Administration (FTA) will provide $38 million to build a bus rapid transit system (BRT) for Austin, Texas-based Capital Metropolitan Transportation Authority (Capital Metro), bringing additional transportation choices to one of the most congested mid-size cities in the country.

The new bus system will make it easier for residents to get to jobs, schools and cultural centers in downtown Austin.

The new MetroRapid bus service includes construction of 40 new bus stations and the purchase of 40 clean diesel buses that will operate along a 37.5-mile route on streets that run parallel to the region’s main highways, I-35 and Loop-1. The service will make it easier for riders to access downtown Austin’s central business district, the State Capitol and the University of Texas at Austin, while saving energy and reducing carbon emissions. More than 20,000 daily riders are expected to use the service when it begins in 2014.

The agreement, which covers about 80% of the $47 million project, clears the way for Capital Metro to begin construction on the new BRT system. According to MetroRapid, the project is expected to create more than 100 construction-related jobs.

FTA Administrator Peter Rogoff also announced an additional $3 million grant from FTA’s State of Good Repair Program that Capital Metro will use toward the replacement of seven worn-out buses in its regular fleet.

 

View comments or post a comment on this story. (0 Comments)

More News

Allison,Cummins hybrid-electric system recieves CARB certification

Allows sales of model year 2015 Allison H 40/50 EP™ hybrid propulsion system paired with the Cummins ISB6.7 and ISL9 diesel-electric hybrid engines for transit buses and coaches.

N.Y. MTA expands courtesy ads to bus system

The campaign is similar to the one developed for subways, with the focus on reminding passengers that avoiding certain behaviors can ensure a faster and more pleasant ride for everyone. Reminders include step aside to let others off first; remove your backpack; and don’t clip your nails on the bus.

Bridj to launch D.C. service

While Founder Matt George is interested in connecting Capitol Hill, K Street and Dupont Circle, it’s not yet clear if those will be the neighborhoods Bridj starts with. The start-up is encouraging interested customers to request specific routes on its website

New Flyer wins N.Y. CNG bus contract

The contract for 110 XN40 buses contains a firm order for 52 buses with options for an additional 58 buses and is valued at approximately $53 million dollars.

CCW to provide Iowa with rebuilt artics

Des Moines Area Regional Transit's 60-foot low floor articulated buses will replace high-floor buses and include newly installed ramps, remanufactured power trains, transmissions, engines and brakes. It will also be equipped with two ADA compliant wheelchair lifts.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close