Bus

TriMet ups security, fare enforcement

Posted on October 31, 2012

TriMet is planning measures to increase the security presence on the transit system.

“We are always vigilant, looking for how we can improve security and increase the safety on our system for our riders and operators,” said TriMet Safety and Security Executive Harry Saporta.

A new K-9 team was certified to join the TriMet Transit Police Division, bringing the force to 62 officers including four full-time K-9 explosives teams.

Additionally, six new fare enforcers start work, joining two others hired earlier this year, which brings the fare enforcement team to the full-time equivalent of 26.

By the end of 2012, all TriMet buses on the road will have security cameras.

 TriMet also increased the number of MAX platforms with cameras and the overall number of cameras on some platforms. There are now more than 820 cameras on platforms system-wide with all MAX platforms to have cameras by the end of 2013. All MAX trains have security cameras.

In July 2011, TriMet hired six additional fare enforcers and moved to fare enforcement over education. In the first full year of the focus on enforcement, citations rose 84% and warnings dropped 55%.

“This shift to enforcement has shown some real results. With more people buying fares, it’s bringing in more revenue and it increases the safety and security presence on the system” said TriMet Operations Executive Director Shelly Lomax. “We are now seeing citations dropping as riders have realized it’s better to follow the rules than pay a fine.”

Riders without a valid fare face a $175 citation and possible exclusion from the system on the first offense.

View comments or post a comment on this story. (0 Comments)

More News

LA Metro board approves contracts for electric, CNG buses

In total, the board approved the purchase of 60 BYD electric buses, 35 electric New Flyer artics, 65 New Flyer CNG artics, and 295 CNG buses from ElDorado.

Calif. Gov. commemorates new Proterra LA manufacturing facility

Partially funded by a grant from the California Energy Commission, the 100,000-square-foot facility has the capacity to manufacture 400 buses annually.

UTA takes delivery of Provo/Orem BRT bus

The New Flyer Xcelsior 60-foot articulated bus is the first to be delivered and will now go through a thorough testing process.

FTA makes $226M in grants available to improve transit bus service

All projects must comply with Buy America regulations, which require that all iron, steel, or manufactured products be produced in the U.S., as well as final assembly of vehicles.

WSP USA designing BRT system for TriMet

The 14-mile Division Transit Project will provide an improved high-capacity connection between downtown Portland and the City of Gresham via Division Street.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close