Bus

DART to open 2 airport lines

Posted on November 13, 2012

Dallas Area Rapid Transit (DART) will debut two new bus connections to DFW International Airport and Dallas Love Field in December, making airline travel in North Texas easier than ever.

Route 500 from the Belt Line Station on the Orange Line to Terminal A at DFW is a preview of the direct light rail connection customers will enjoy in December 2014. Route 524 from the Inwood/Love Field Station on the Green Line improves service to Love Field with more frequent bus trips.

Route 500 will serve DFW Airport, area hotels along Plaza Drive, and CentrePort Station. It operates seven days a week between the new Belt Line Station and DFW Terminal A with most trips also connecting to Trinity Railway Express (TRE) service at CentrePort/DFW Airport Station. Buses depart every 15 minutes during rush hours, 20 minutes mid-day and 30 minutes late evenings and meet every Orange Line train. Buses to CentrePort/DFW will be available Monday through Saturday when TRE trains are in operation.

The new route offers a benefit to those airline customers wishing to take advantage of DART's long term parking feature at Belt Line Station with its 596 parking spaces.

Meanwhile, the new Route 524 will begin connecting customers arriving on board either the Green or Orange Lines at Inwood/Love Field Station with access to Dallas Love Field Airport. Operating every 15 minutes during rush hours, 20 minutes mid-day and 30 minutes late evening, bus service will match Green Line train frequencies and provide direct service to the Love Field terminal.

View comments or post a comment on this story. (0 Comments)

More News

UTA takes delivery of Provo/Orem BRT bus

The New Flyer Xcelsior 60-foot articulated bus is the first to be delivered and will now go through a thorough testing process.

FTA makes $226M in grants available to improve transit bus service

All projects must comply with Buy America regulations, which require that all iron, steel, or manufactured products be produced in the U.S., as well as final assembly of vehicles.

WSP USA designing BRT system for TriMet

The 14-mile Division Transit Project will provide an improved high-capacity connection between downtown Portland and the City of Gresham via Division Street.

New Flyer to supply 14 60-foot articulated buses to Brampton Transit

The vehicles will be delivered starting Q1 2018.

Valley Metro to add 187 ElDorado, New Flyer buses

All vehicles are funded by Federal Transit Administration and a half-cent sales tax that funds the Regional Transportation Plan in Maricopa County, which was approved by voters in 2004.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close