Bus

$474M available for 5th round of TIGER grants

Posted on April 23, 2013

Approximately $474 million is available through the fifth round of the TIGER (Transportation Investment Generating Economic Recovery) competitive grant program, which funds surface transportation projects that have a significant impact on the nation, a region or metropolitan area.

To view the Notice of Funding Availability, click here.

Projects eligible for TIGER grants include highways and bridges, public transportation, passenger and freight rail transportation, and marine port infrastructure investments. Grants may range in size from $10 million to $200 million. Grants to rural areas may be for less than $10 million, but must be more than $1 million. No less than $120 million must be awarded to projects in rural areas.

The four previous rounds of TIGER provided $3.1 billion to support 218 projects in all 50 states, the District of Columbia and Puerto Rico. Demand for the program has been overwhelming, with more than 4,050 applicants requesting more than $105.2 billion over the previous rounds, according to the U.S. Department of Transportation (U.S. DOT).

More than 100 of the TIGER grants were awarded directly to city or county governments that are otherwise unable to directly access traditional sources of federal funding for their projects. Similarly, more than 19 TIGER grants were awarded directly to port authorities, and eight to tribal governments. TIGER has also helped catalyze 11 multi-state projects, which would have been difficult to advance through federal formula programs.

The FY 2013 Appropriations Act requires that TIGER funds be obligated before Oct. 1, 2014. The limited amount of time means the U.S. DOT will give priority to projects that are ready to proceed quickly.

In addition to project readiness, primary selection criteria include improving the condition of existing transportation facilities and systems; contributing to the economic competitiveness of the U.S. and creating and preserving jobs; increasing transportation choices and access to transportation services for people in communities across the U.S.; improving energy efficiency, reducing dependence on oil and reducing greenhouse gas emissions; and improving safety.

Applications are due June 3.  

View comments or post a comment on this story. (0 Comments)

More News

Calif. Gov. commemorates new Proterra LA manufacturing facility

Partially funded by a grant from the California Energy Commission, the 100,000-square-foot facility has the capacity to manufacture 400 buses annually.

UTA takes delivery of Provo/Orem BRT bus

The New Flyer Xcelsior 60-foot articulated bus is the first to be delivered and will now go through a thorough testing process.

FTA makes $226M in grants available to improve transit bus service

All projects must comply with Buy America regulations, which require that all iron, steel, or manufactured products be produced in the U.S., as well as final assembly of vehicles.

WSP USA designing BRT system for TriMet

The 14-mile Division Transit Project will provide an improved high-capacity connection between downtown Portland and the City of Gresham via Division Street.

New Flyer to supply 14 60-foot articulated buses to Brampton Transit

The vehicles will be delivered starting Q1 2018.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close