Bus

AC Transit BRT project gains final approval

Posted on January 27, 2014

With a similar agreement with the City of San Leandro, Calif., already in place, AC Transit and the City of Oakland have come to terms on the agency’s bus rapid transit project (BRT), eliminating the last major obstacle between concept and construction.

After weeks of discussion, the parties endorsed the East Bay Bus Rapid Transit Operations and Maintenance Agreement (O&M), which outlines specific responsibilities for the project’s viability once the BRT service begins.

The BRT will cruise the 9.5-mile stretch from downtown Oakland to San Leandro BART. The project will make bus transit more efficient and cleaner with dedicated bus lanes, improved street lighting and crosswalks, artistic landscaping, signal priority, elevated boarding stations and more.

Along with bringing a new look to the corridor, the BRT will create more than 1,000 jobs during its construction phase and help stimulate businesses along the street for years to come, according to AC Transit. The new bus service will provide one of the busiest traffic corridors in the country with a fast, economical and environmentally-friendly transportation system.

“As partners, the District and the City of Oakland have worked hand-in-hand toward building and operating these new transit stations and the host of amenities that will improve the look and safety along this corridor,” said AC Transit GM David Armijo.

Armijo noted that the BRT project will invest more than $100 million in traffic improvements, parking and other beautification efforts to dramatically enhance the densely-populated, well-worn corridor.

BRT construction will begin this year. The service will be fully implemented in 2017.

View comments or post a comment on this story. (0 Comments)

More News

Man charged with murder after stabbing Winnipeg Transit bus driver

The incident occurred at 2 a.m., when the driver pulled up to the last stop of his shift and asked the man to leave the bus. After a physical altercation, which ended up outside the bus, ensued, the driver was stabbed multiple times.

N.Y.'s NICE to add 33 New Flyer buses

Twenty-eight 40-foot buses will replace existing buses in the NICE fleet that have reached the end of their useful life, while five 60-foot buses will be used on the customer's new bus rapid transit line, scheduled to start service in 2017.

Nova Bus, ABB partner for electric bus, charger delivery to N. America

The ABB DC fast charger, with the associated systems, is based on the common interface, which allows charging stations and electrified buses from different manufacturers to be used together.

Proterra names Horton to CCO post

Will lead the end-to-end customer lifecycle as Proterra triples production and initiates large-scale deployments across North America.

Stertil-Koni adds new capabilities to transmission jack

The battery-operated jack can be charged overnight and used without cables. The pneumatic jack has an attached air hose to keep it working. Previously, transmission jacks were manually hand-pumped, much like a car jack.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close