Management & Operations

A laundry list of challenges

Posted on August 1, 2004

In METRO's inaugural paratransit survey, conducted in June and July of this year, operators were asked to describe their biggest challenge in providing paratransit service. Not surprisingly, budget and cost-related problems were cited most often, but responses varied widely. We've provided some of the more interesting and insightful answers.

  • There is no standardized wheelchair built to integrate with vehicles.

  • Many clients need and expect a lot more assistance than is required by ADA regulations.

  • Clients are never ready when the ride arrives.

  • Meeting all ride requests within ADA parameters with available resources is a constant struggle and everyday juggling act.

  • Construction sites on the road, winter conditions and users who take so long that it puts drivers behind schedule.

  • There is an ever-increasing demand for equipment and a lack of availability.

  • Demand for more paratransit services increases mileage and accelerates wear and tear on vehicles.

  • Paratransit vans cannot keep up with demand like commercial vehicles can, thus they require engine and transmission replacements prior to the end of their useful life.

  • Meeting the demand for growth in paratransit service with increasingly strained resources.

  • Recruiting and keeping operators.

  • Adjusting to the daily and weekly changes to service demand.

  • Accessibility to specific addresses.

  • The multitude of makes and models of mobility devices is challenging.

  • Drivers sometimes lack knowledge of the service area.

  • Rider education is difficult.

  • City congestion.

  • Delivering service with the highest possible on-time performance.

  • Being able to provide trips and good service to all customers, while at the same time controlling the ever-increasing costs associated with paratransit service.

  • Trying to set policies and procedures.

  • The size of mobility equipment is getting larger, and the ramps on the lifts are not able to accommodate the length and/or width of the devices. There needs to be more regulation in the manufacturing of mobility equipment.

  • Number of trip requests is steadily growing while, at the same time, the traffic in areas served continues to worsen due to increased population. This serves to slow down vehicles and aggravate the ability to respond to increased demand.

  • Addressing the safety issues of transportation of scooters. There is no good way to adequately secure a scooter, and even if there were, the passenger cannot be safely secured to the scooter itself. We think that the ADA should mandate that individuals in these mobility devices transfer to a seat.

  • Effective scheduling of service. Installing new paratransit computer software can replace an outdated system.

  • Traffic congestion and road construction cause serious time delays.

  • Customer expectations don't always match ADA regulations.

  • Fleet is not large enough to accommodate service needs.

  • People change scheduled rides too frequently.

  • The time it takes to properly maintain equipment is costly.

View comments or post a comment on this story. (0 Comments)

More News

Technology, shifts in behavior can improve urban transportation: report

Respondents around the globe chose "driving their own car" over other modes of transport for reasons including comfort (54%), ease of access (47%), and reliability (39%).

Phoenix names new bus rapid transit administrator

Mike James spent the last four-and-a-half years planning and managing rail and transit corridors in Seattle, which included street car operations and seven new BRT corridors.

Deadline extended for Innovative Solutions Award submissions

Applications can be submitted either by the operation or the solutions provider and will be judged by our BusCon Advisory Board, with winners and shortlisted submissions recognized at BusCon’s Award Breakfast on Wednesday, Sept. 13.

Calif.'s GCTD breaks ground on ops, maintenance facility

The new facility will replace an outdated and deteriorating bus garage located on a three-acre site that was originally built in the 1970’s for a much smaller fleet.

London most expensive city to commute to work via public transit

New York City comes in it at No. 4 at a cost of approximately $120 per month, with Chicago and San Francisco at $102.10 and $86.10 per month, respectively.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close