San Diego MTS installs first of 600 bus shelters slated for area
All bus benches will be replaced by Tolar Manufacturing within the next 12 months and will cost $1.5 million. Tolar shelter installation will take five years and cost $6.4 million.
The San Diego Metropolitan Transit System (MTS) is continuing to upgrade the region’s transit system with the installation of 600 new bus shelters and more than 1,800 benches in communities throughout San Diego. The upgrades come after major capital investments in new bus facilities in the South Bay and East County ($54 million) and a five-year reconstruction of the Trolley system ($660 million).
“This is another step toward modernizing San Diego’s transit system. We’ve made progress on a number of fronts, and new bus shelters and benches are a big part of enhancing the customer experience,” said MTS CEO Paul Jablonski.
Tolar Manufacturing, based out of Corona, Calif., will manufacture both products. All bus benches will be replaced within the next 12 months and will cost $1.5 million. Shelter installation will take five years and cost $6.4 million.
MTS currently has 450 shelters, so the improvement project will not only replace existing shelters, but include up to 150 additional shelters for passengers. Shelter amenities include solar and LED lighting systems; a modern design; dual purpose receptacles for trash and recycling; five-foot custom aluminum benches; large, easy-to-read display cases for system maps and timetables; and a custom roof design to prevent rain runoff from the shelter’s front and side openings shelter.
METRO’s People Movement highlights the latest leadership changes, promotions, and personnel news across the public transit, motorcoach, and people mobility sectors.
BART began offering select parking lots to non-BART riders to generate new revenue to help address its FY27 $376M operating budget deficit brought on by remote work.
Drawing on decades of industry experience, Evans-Benson offered insights into the differences between the two, along with tips for better customer engagement and more.
The renewals include continued operations at Fort Lauderdale-Hollywood International Airport in Florida; the PRTC in Virginia; and RTC Washoe in Nevada.
The governor’s proposed auto insurance reforms could save the agency $48 million annually by limiting payouts in crashes where buses are not primarily at fault.
What truly drives the cost of a paratransit fleet? Beyond the purchase price, seven operational factors quietly determine maintenance frequency, downtime, and long-term service reliability. This whitepaper explores how these factors shape lifecycle cost and what agencies should evaluate when selecting paratransit vehicles.
In this conversation, TBC’s Executive Director Ed Redfern, President Corey Aldridge, and Washington Representative Joel Rubin outline the coalition’s key policy priorities, the challenges facing transit agencies, and how industry stakeholders can work together to strengthen the voice of bus transit at the federal level.
Amanda Wanke, who has worked at DART for 10 years, including the past 2½ years as CEO, will join Metro Transit as deputy chief operating officer, operations administration.