Daimler releases new Sprinter model
The Shuttle Van now joins the Cargo Van, Passenger Van and Chassis Cab.

[IMAGE]Sprinter.jpg[/IMAGE]Daimler Vans USA is launching its fourth new Sprinter model — the Shuttle Van, which joins the Cargo Van, Passenger Van and Chassis Cab.
Complete with many Mercedes-Benz safety and convenience features, the low-floor Sprinter Shuttle Van seats up to 16 passengers and comes in four different configurations including paratransit.
Standard equipment includes an electrically operated split-entry door and step to make it easy on passengers with luggage, with air suspension that ensures automatic vehicle leveling, regardless of the load. All Mercedes-Benz and Freightliner Sprinters are powered by a 3.0-liter V6 diesel that gets 30 percent better fuel economy than a comparable gasoline engine.
The Paratransit Shuttle is available with side or rear wheelchair lift and offers multiple wheelchair positions and forward-facing seating for up to 8 passengers, plus driver.
Every Sprinter comes with the safety features people have come to expect from Mercedes-Benz — ADAPTIVE ESP stability and rollover control, ABS anti-lock brakes, Brake Assist and traction control. The driver and front passenger seats are equipped with standard multi-stage front air bags and side curtain and torso air bags are optionally available. Other options include Bi-Xenon headlights, a tire pressure monitoring system and a Parktronic parking aid.
All Mercedes-Benz and Freightliner Sprinters are also equipped with five-speed automatic transmissions, four-wheel disc brakes and independent strut suspension with coil springs in front as well as a solid axle with leaf springs at the rear. Several choices of springs, shock absorbers and stabilizer bars provide just the right suspension for each version of the Sprinter van.
More Paratransit

Reinventing Fleet Maintenance with Real-time Visibility and AI
Transit leaders need to know what needs fixing, where to look, who is responsible, when work is completed, and what it costs without having to chase information across disconnected systems.
Read More →
SamTrans Sets Priorities for Potential Connect Bay Area Revenue
The board-approved framework allocates future funding to maintaining service, rider improvements, equity initiatives, and infrastructure repairs.
Read More →
Chicago's NITA Act Moves Into Next Phase as Service Improvements Begin
Rider-focused improvements will begin rolling out across the system immediately as CTA, Metra, and Pace increase service this summer in the six-county region.
Read More →A True Low-Floor Minibus Design Delivers Better Accessibility and Efficiency for Everyone
As transit demands evolve, so should your fleet. Download the whitepaper to see how the Low-Floor Frontrunner Minibus compares to traditional options.
Read More →2026 METRO Buyer’s Guide & Directory
Searching for the right vehicles, technology, equipment, or services for your public transit or motorcoach operation? This industry guide brings together manufacturers and suppliers from across the transportation market — all in one place. Download it to connect with the companies that help agencies and operators improve mobility, enhance operations, and move their organizations forward.
Read More →
Rays the Mark Foundation to Honor CDTA’s Emily DeVito at October Fundraiser
Event at Chicago-area Ravisloe Country Club will support DeVito, a transit employee and mother of twins battling kidney failure and awaiting a transplant.
Read More →
King County Test Heliox Chargers, Keolis Lands California Contract Top Biz Briefs
Stay informed with these quick takes on the projects and companies driving progress across the transportation landscape.
Read More →
Spare Expands AI-Native Operations Platform With Fixed-Route Capabilities
The launch marks a major milestone in Spare’s vision for unified transit operations.
Read More →
Via Announces Scheduling and Supply Studio
The Scheduling and Supply Studio provides the world’s first fully integrated platform for optimizing vehicle and driver availability to rider demand, said company officials.
Read More →
Boston's MBTA Completes Latest Green Line Work
The work took place during 12 consecutive days of shuttle bus service replacement between Kenmore and Cleveland Circle.
Read More →