METRO Magazine Logo
MenuMENU
SearchSEARCH

Chicago Transit to pilot 'Train Tracker'

Estimated arrival times will be generated through a combination of scheduling information and data collected by the CTA's QuickTrak program, which monitors signaling systems and indicates when a portion of track is occupied by a train.

December 30, 2010
2 min to read


The Chicago Transit Authority (CTA) will launch a pilot version of the highly anticipated CTA Train Tracker in early January via a dedicated website. Customers using desktop computers or mobile Web-enabled devices, such as iPhones, BlackBerries or smartphones, will be able to access estimated arrival times for trains on all eight rail lines.

Estimated arrival times will be generated through a combination of scheduling information and data collected by the CTA's QuickTrak program, which monitors signaling systems and indicates when a portion of track is occupied by a train.

Ad Loading...

An average transit time is determined by measuring how long it takes a train to travel a portion of track. By averaging the travel times of the last five trains to move across a portion of track, the CTA can calculate the estimated arrival times for trains at each station.

To view estimated arrival times, customers will simply have to go to the dedicated website, select their preferred rail line and then choose a station. Arrival times of approaching trains within a 15-minute timeframe will be provided for the selected station, and results will refresh approximately every 20 seconds to 30 seconds.

Customers will have the option to choose the number of results displayed and how they are sorted — either by track or route if the station is served by multiple rail lines; or by time to arrival.

In the event arrival times cannot be calculated — such as with the first trains in the morning — Train Tracker will provide and indicate schedule information for the next arriving train(s).

Since April, stations equipped with electronic signs have been testing estimated arrival time displays. Because the electronic displays across the rail system are not uniform in age, size, character availability or the number of lines displayed, personnel have been working diligently to develop a consistent method of delivering accurate data for the various display types.

Ad Loading...

As part of the Train Tracker pilot, electronic signs at 10 CTA stations also will feature arrival information either on the platform or mezzanine levels.

Specific details regarding CTA Train Tracker and station locations that will display train arrival information will be made available in January when the program is officially launched, according to the agency.

More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →