Amtrak pilots e-ticketing on Downeaster service
Passengers will be able to print their tickets from their home, office or at Amtrak ticket offices and Quik-Trak kiosks. Passengers also will be able to use their smart phones to present their eTickets to the conductor by opening the eTicket PDF document from their email on their smart phone and displaying the barcode for the conductor to scan.
Amtrak is starting a pilot test of its eTicketing system on the Downeaster service, which operates daily between Boston and Portland, Maine.
The eTicketing program provides passengers with increased flexibility when making or changing reservations and eliminates the need to obtain traditional paper tickets. Amtrak intends to roll out eTicketing to all its trains nationwide during 2012.
With eTicketing, passengers have the ability to print their reservations from the comfort of their home or office. A receipt will be e-mailed to the customer with the eTicket attached as a printable PDF document which can be printed any time prior to travel.
Passengers also will be able to use their smart phones to present their eTickets to the conductor by simply opening the eTicket PDF document from their email on their smart phone and displaying the barcode for the conductor to scan.
If a customer misplaces their eTicket, they can re-print the document for presentation on board. Passengers may also print their eTickets at Amtrak ticket offices and Quik-Trak kiosks.
During the pilot test, eTickets will be issued to passengers who have one way or round trip reservations. Passengers with more complicated bookings will continue to receive traditional paper value tickets, including when they:
• Are traveling beyond the Downeaster route;
• have purchased a Multi-Ride Ticket; (e.g., monthly or ten-trip ticket)
• have a group ticket;
• are paying travel on the train; or
• have purchased travel at a travel agency or corporate travel office.
Amtrak Downeaster eTicketing customers will now be able to make changes to their reservations online until the start of their journey. During 2012, Amtrak will look to provide greater flexibility to its online customers with respect to modifying reservations once a trip is under way.
Amtrak operates the Downeaster under contract with the State of Maine’s Northern New England Passenger Rail Authority. Ridership on the Amtrak Downeaster line increased dramatically this past year, exceeding the 500,000 passenger mark for the first time, with overall ridership more than doubling since 2005.
With the introduction of this new eTicketing capability for customers, Amtrak has also garnered industry recognition by earning a spot on the 2011 InformationWeek 500 list of top technology innovators across America. This prestigious award recognizes Amtrak’s innovative use of this mobile technology and the significant value provided to passengers and conductors.
More Rail

Trinity Metro Breaks Ground on $270M TEXRail Extension
The 2.1-mile extension will connect Fort Worth’s Medical District and Near Southside to downtown, surrounding communities, and Dallas-Fort Worth International Airport.
Read More →
Bringing Austin’s First Light Rail System to Life
Austin Transit Partnership CEO Greg Canally discusses the city's nearly 10-mile light rail project, its collaborative approach to project delivery, the importance of community engagement, and the milestones ahead as construction approaches in 2027.
Read More →
Metra Draft Plan Outlines Costs, Service Improvements for Regional Rail
The Systemwide Network Plan identifies infrastructure needs and potential investments to expand all-day, bidirectional rail service across the Chicago region.
Read More →
Amtrak Completes First Street Tunnel Upgrades, Restores Service
The nine-day construction project included replacing aging track infrastructure and modernizing switch systems near Washington Union Station.
Read More →
FRA Announces $2.3B for Passenger, Freight Rail Projects Nationwide
The CRISI Grant Program funding will support rail infrastructure improvements, safety upgrades, and projects aimed at improving freight and passenger rail service across 45 states and Washington, D.C.
Read More →
Caltrain’s Electrification Drives a New Era of Ridership Growth
The railroad’s shift to electric service has brought more frequent trains, stronger customer satisfaction, and increased ridership, earning it APTA’s Outstanding Public Transportation System award.
Read More →
FTA Advances $164M Broward County Commuter Rail Project
The proposed 10.5-mile commuter rail extension would connect Fort Lauderdale and Aventura, expanding passenger rail options in South Florida.
Read More →
New York MTA Launches Historic $1.9B Signal, Track Modernization Project
Funded in part by congestion pricing revenue, the project will replace nearly century-old signals along the A and C lines in Brooklyn and Queens.
Read More →
LA Metro Breaks Ground on East San Fernando Valley Light Rail Project
The 6.7-mile line will add 11 stations along Van Nuys Boulevard, expand access to jobs and regional transit connections, and support Metro’s broader efforts to improve mobility as rail ridership grows.
Read More →
CSA Group Releases Climate Resilience Standard for Transit, Passenger Rail
Developed with support from the Standards Council of Canada, CSA D700 guides assessing climate-related risks and planning adaptation measures for transit and passenger rail systems.
Read More →