METRO Magazine Logo
MenuMENU
SearchSEARCH

Conn. DOT holds tour of BRT construction project

The CTfastrak Flatbush Avenue Station will include a large center island platform where all CTfastrak shuttle buses will stop, an express lane on the dedicated roadway for buses that bypass this station, a local bus stop on New Park Avenue and a limited number of parking spaces and a convenient drop-off location inside the parking area for riders.

August 14, 2012
2 min to read


The Connecticut Department of Transportation (DOT) held a CTfastrak project construction briefing and tour of the Flatbush Avenue Station and bridge site in West Hartford. It was the first construction tour and update of the CTfastrak bus rapid transit project (BRT), slated for completion in late 2014.

The CTfastrak Flatbush Avenue Station will include a large center island platform where all CTfastrak shuttle buses will stop, an express lane on the dedicated roadway for buses that bypass this station, a local bus stop on New Park Avenue and a limited number of parking spaces and a convenient drop-off location inside the parking area for riders. The new bridge will be realigned approximately 75 feet south of the existing Flatbush Avenue surface roadway to minimize traffic disruption during construction.

Ad Loading...

This Flatbush bridge segment of the project is being completed for an estimated $17.5 million as part of an overall $130 million contract. At peak construction, about 50 workers will be employed at the Flatbush Avenue bridge site, which is expected to be completed in the summer of 2014.

The bridge work is being paid for with 80% federal highway funds and 20% state funds. The overall project will mean 4,000 construction jobs and 100 permanent jobs.

The 9.4 mile CTfastrak route is being constructed on an abandoned railroad corridor from New Britain to Newington Junction and from Newington Junction to Hartford's Union Station alongside the active Amtrak rail right of way. The segment that includes the Flatbush station and overpass is part of a 5.8 mile stretch that begins near Cedar Street in Newington and runs north to Sigourney Street in Hartford.

More Bus

Frontrunner's new facility in Billerica, Massachusetts.
Busby StaffJune 8, 2026

Frontrunner Bus Group Expands with New Massachusetts Headquarters

The significantly larger facility will provide the infrastructure needed to support the company’s growing workforce, advanced technologies, and expanding product line.

Read More →
New MobilityJune 5, 2026

Joshua Schank on Transportation Innovation, Risk, and the Future of Mobility

In this edition of METROspectives, Joshua Schank discusses lessons from launching LA Metro’s Office of Extraordinary Innovation, the challenges of advancing new mobility technologies, and much more.

Read More →
A maintenance person with a tablet.
ManagementJune 5, 2026

Reinventing Fleet Maintenance with Real-time Visibility and AI

Transit leaders need to know what needs fixing, where to look, who is responsible, when work is completed, and what it costs without having to chase information across disconnected systems.

Read More →
Ad Loading...
SamTrans planning for ballot measure
Managementby StaffJune 4, 2026

SamTrans Sets Priorities for Potential Connect Bay Area Revenue

The board-approved framework allocates future funding to maintaining service, rider improvements, equity initiatives, and infrastructure repairs.

Read More →
World Cup Crowds Will Test Transit Systems
ManagementJune 3, 2026

When Routine Fails: How Public Transit Must Adapt for the World Cup

The 2026 FIFA World Cup will test transit agencies’ ability to manage unpredictable travel patterns, making real-time data and operational flexibility critical to moving millions of visitors efficiently.

Read More →
Bus Roadeo at APTA Mobility 2026
Busby Staff and News ReportsJune 1, 2026

Photo Highlights from APTA's 2026 Mobility Conference

The photo gallery captures scenes from the conference, including the International Bus Roadeo, exhibit hall activities, the Bus Showcase, and much more.

Read More →
Ad Loading...
Managementby StaffJune 1, 2026

Chicago's NITA Act Moves Into Next Phase as Service Improvements Begin

Rider-focused improvements will begin rolling out across the system immediately as CTA, Metra, and Pace increase service this summer in the six-county region.

Read More →
A SEPTA bus going down the road
Managementby StaffJune 1, 2026

Philadelphia's SEPTA Approves Annual Transit Service Plan

Between 2021 and 2024, SEPTA held more than 200 public meetings — including 144 in-person sessions — throughout the SEPTA service region.

Read More →
frontrunner bus image
SponsoredJune 1, 2026

A True Low-Floor Minibus Design Delivers Better Accessibility and Efficiency for Everyone

As transit demands evolve, so should your fleet. Download the whitepaper to see how the Low-Floor Frontrunner Minibus compares to traditional options.

Read More →
Ad Loading...
A New Flyer 60-foot articulated bus
Busby StaffMay 29, 2026

WMATA Debuts 'Fares Pay for Service' Awareness Campaign

The campaign was highlighted during a media event at the Paul S. Sarbanes Transit Center in Silver Spring, where WMATA’s GM/CEO Randy Clarke joined Metro Transit Police officers, WMATA management team, board members, and staff to expand fare enforcement and customer education efforts on Metro Bus routes throughout the region.

Read More →