Calif. opens three new L.A. Union Station tracks, platform
Passenger rail service has increased from six daily trains to 22 daily trains, since Caltrans began managing Amtrak's Pacific Surfliner corridor.
Caltran’s Division of Rail, Amtrak, Southern California Regional Rail Authority and Los Angeles County Metropolitan Transportation Authority celebrated the opening of three new Los Angeles Union Station tracks and a platform to serve Amtrak and Metrolink passengers.
“Amtrak appreciates the efforts of this project’s partners, Caltrans and the Southern California Regional Rail Authority, along with the various private sector contractors and vendors,” said Mike Chandler, Amtrak general superintendent, southwest division. “The new tracks and platform are welcome improvements as they will enhance train operations at the station and benefit ever-growing numbers of passengers seeking to travel by rail.”
Passenger rail service has increased from six daily trains to 22 daily trains, since Caltrans began managing the Pacific Surfliner corridor.
The three new tracks and platform, which were removed more than 35 years ago, were reestablished to serve the increasing train travel demand, which today surpasses that of World War II. Ridership on Amtrak’s Pacific Surfliner, the second busiest corridor in the nation, has increased significantly in the last 10 years.
Los Angeles Union Station is the nation’s fifth busiest train station serving more than two million Amtrak and Metrolink passengers annually. New station tracks 13 and 14 and platform 7 will augment the existing tracks 3 to 12, which currently serve Amtrak national trains, Amtrak California’s the Pacific Surfliner and Metrolink service. Track 15 will be used as storage.
The project’s design maintained the stations historic architectural style and includes north and south stairways and accessible ramps that connect to the main passenger tunnel. Other enhancements include a new electronic passenger information system and energy efficient lighting renovations to the existing platform canopy.
The new track construction, which was managed by Metrolink, began in May 2011 and was complete in September 2012. The $23.5 million project was funded with $20.5 million in Proposition 1B, $2,656,000 in federal funds and $344,000 in local funds.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →