YCON to install L.A. energy storage substation
The WESS is largely funded by the Federal Transit Administration under the Transit Investments for Greenhouse Gas and Energy Reduction with funds made available by the American Recovery and Reinvestment Act of 2009.
YCON, designer and manufacturer of energy storage flywheel systems, announced it was awarded a $3.6 million contract by the Los Angeles County Metropolitan Transportation Authority (Metro) to install a Wayside Energy Storage Substation (WESS) at the L.A. Metro Red Line Westlake/MacArthur Park Station utilizing VYCON's REGEN clean energy flywheel systems.
The WESS is largely funded by the Federal Transit Administration under the Transit Investments for Greenhouse Gas and Energy Reduction with funds made available by the American Recovery and Reinvestment Act of 2009.
VYCON's clean energy high-speed flywheel technology will recycle part of the energy in the system by absorbing and storing in kinetic form energy regenerated by braking trains in the line and returning this stored energy to trains in acceleration in a clean, instantaneous form. This recycling of energy will save electricity otherwise wasted in the form of heat.
VYCON's REGEN flywheel system captures the wasted energy at cycles as low as once per minute and can scale up in power capacity with parallel systems.
The new WESS system will also demonstrate how it can replace Traction Power Substations with voltage levels support, lower the cost of peak power demands, reduce energy consumption, decrease resistor bank and/or friction heat generation (wasted energy), and lower power demands to the utility during critical peak power usage.
Over the next year, VYCON plans to collaborate with several transit agencies around the world to install demonstration sites that will provide real-world data for energy and power savings as well as validating REGEN's ability to eliminate voltage sag issues, and most importantly, the ability to replace chemical battery-based Traction Power Substations.
More Rail

Amtrak, CN Reach Agreements to Strengthen Passenger Rail Service, Safety
The agreement resolves a more than decade-long proceeding before the Surface Transportation Board concerning the terms and conditions for Amtrak services, such as the City of New Orleans, Illini/Saluki, and Wolverine.
Read More →
New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →