Richland, Wash.-based Ben Franklin Transit was awarded a CALSTART grant to work with company to develop an all-electric remanufactured transit bus that has the capability of going more than 100 miles.
With the help of a CALSTART grant that was directed to Washington state by Sen. Patty Murray (D-WA), Richland, Wash.-based Ben Franklin Transit (BFT)is working with Southern California-based Complete Coach Works (CCW) to develop an all-electric remanufactured transit bus that has the capability of going more than 100 miles.
While an electric bus is innovative in itself, CCW is taking it one step further by significantly reducing the carbon footprint involved with building a transit bus by remanufacturing an existing bus into like-new condition, reducing capital expenditures in the process. Not only are carbon emissions reduced through this approach, but landfill pollution is reduced as well.
Ad Loading...
When Ben Franklin Transit heard about this environmentally sustainable approach and what CCW was doing, the agency became part of a demonstration program and committed one of its buses.
“This is great news for Tri-Cities residents and businesses,” said Sen. Murray. “As Chair of the Transportation, Housing, and Urban Development Appropriations Subcommittee, I was proud to help direct this funding to Washington state, and pleased that the bus will be operating soon in the Tri-Cities. I applaud the entire Ben Franklin Transit team for their work and I look forward to seeing the bus on Tri-City streets in the new year.”
Ben Franklin Transit’s bus, when completed, will have all electrical components, auxiliary wiring, seats, air conditioning systems and flooring replaced with high quality new parts. The all-electric drive system, motor, controller and advanced Li-ion battery packs will be installed, as will a new, energy efficient air conditioning system.
The remanufacturing process is so detailed and complete that the bus will be issued a new title and current year registration. Because CCW made a point to source as many U.S. parts and components as possible, the bus is “Buy America” compliant.
Ben Franklin Transit, in collaboration with CCW, evaluated the bus route that will benefit the most from the deployment of the electric transit bus. Ben Franklin Transit Route 23/26 is currently a good fit for this all-electric transit bus. Because of frequent stops within a total eight-mile loop and low average speed, the route provides ideal conditions for the regenerative braking-enabled ZEPS bus.
What truly drives the cost of a paratransit fleet? Beyond the purchase price, seven operational factors quietly determine maintenance frequency, downtime, and long-term service reliability. This whitepaper explores how these factors shape lifecycle cost and what agencies should evaluate when selecting paratransit vehicles.
In this conversation, TBC’s Executive Director Ed Redfern, President Corey Aldridge, and Washington Representative Joel Rubin outline the coalition’s key policy priorities, the challenges facing transit agencies, and how industry stakeholders can work together to strengthen the voice of bus transit at the federal level.
Originally introduced in 2023 as the Bus Line Redesign, the effort has evolved into a more targeted update that maintains familiar routes while improving reliability, frequency, evening and weekend service, and connections across Allegheny County.
S3 will connect communities along SR 522 with fast, reliable, battery-electric bus service from Shoreline South Station to Bothell via Kenmore and Lake Forest Park.
The configuration uses Ster Seating's Gemini seat platform to create a family-friendly floor layout specifically engineered to accommodate parents traveling with young children.
The Renton Transit Center project will relocate and rebuild the Renton Transit Center to better serve the regional Stride S1 line, local King County Metro services, and the future RapidRide I Line.