METRO Magazine Logo
MenuMENU
SearchSEARCH

Stertil-Koni to equip Texas’ Sun Metro

Will produce and install 18 high-capacity, heavy duty vehicle lifts. the contract purchase calls for Stertil-Koni to deliver two of the company’s lifting systems: ECOLIFT and SKYLIFT.

January 24, 2013
Stertil-Koni to equip Texas’ Sun Metro

 

2 min to read


Stertil-Koni, a supplier of heavy duty vehicle lifts, was awarded a contract with the City of El Paso Mass Transit Department, known as Sun Metro, to produce and install 18 high-capacity, heavy duty vehicle lifts.

Specifically, the contract purchase calls for Stertil-Koni to deliver two of the company’s lifting systems. Selected were: ECOLIFT, the industry’s first U.S. patented, ultra shallow, full-rise scissor in-ground lifting system, according to the company; and, SKYLIFT – an industry-changing platform lift distinguished by an entirely vertical rise lifting system which utilizes two independent runways with no crossbeams, no overhang and no base frame.

Sun Metro has ordered two models of the ECOLIFT, a two-scissor configuration with lifting capacity of 60,000 lbs. — ideal for regular transit buses —  and a three-scissor configuration with lifting capacity of 90,000 lbs., well designed for the extended length of articulated buses.   

Sun Metro has also ordered two models of SKYLIFT — each with a lifting capacity up to 78,000 lbs. One model is a wash bay SKYLIFT, engineered to be completely water-resistant with hot-dip galvanized platforms, lift supports with an extremely resistant maritime epoxy coating along with a watertight, lockable stainless steel control box. Lifts are scheduled to be installed beginning in the first half of 2013. For added safety, the Stertil-Koni equipment is third-party tested and validated by ALI/ETL-Interk.

The City of El Paso award to Stertil-Koni follows two other recent major transit awards to the company. These include a bid from the Chicago Transit Authority, awarded for the production and installation of 54 heavy duty vehicle lifts, and an extensive installation of hydraulic, self-regenerating mobile columns lifts, as well as in-ground lifts, delivered to GO Transit in Canada.

More Bus

County and agency officials break ground in front of a red and yellow King County Metro public transit bus.
Busby StaffMarch 20, 2026

Seattle’s King County Breaks Ground on RapidRide I Line to Expand High-Capacity Transit

The 17-mile RapidRide I Line will bring faster, more frequent service and improved regional connections across South King County.

Read More →
paratransit bus
SponsoredMarch 16, 2026

Measuring the True Cost of Paratransit Fleets

What truly drives the cost of a paratransit fleet? Beyond the purchase price, seven operational factors quietly determine maintenance frequency, downtime, and long-term service reliability. This whitepaper explores how these factors shape lifecycle cost and what agencies should evaluate when selecting paratransit vehicles.

Read More →
Cover photo for METROspectives with The Bus Coalition
Busby Alex RomanMarch 13, 2026

Inside The Bus Coalition’s Push for Stronger Federal Transit Investment

In this conversation, TBC’s Executive Director Ed Redfern, President Corey Aldridge, and Washington Representative Joel Rubin outline the coalition’s key policy priorities, the challenges facing transit agencies, and how industry stakeholders can work together to strengthen the voice of bus transit at the federal level.

Read More →
Ad Loading...
Cover photo for Biz Briefs dated March 6, 2026
Technologyby Staff and News ReportsMarch 6, 2026

Biz Briefs: Tolar Manufacturing Supports PSTA Spark Service and More

Stay informed with these quick takes on the projects and companies driving progress across the transportation landscape.

Read More →
Passengers boarding a PRT bus
Busby StaffMarch 2, 2026

Pittsburgh Unveils 'Bus Line Refresh' Plan

Originally introduced in 2023 as the Bus Line Redesign, the effort has evolved into a more targeted update that maintains familiar routes while improving reliability, frequency, evening and weekend service, and connections across Allegheny County.

Read More →
Stickers and a paper bus for S3 bus line
Busby StaffMarch 2, 2026

Seattle's Sound Transit Breaks Ground on S3 Bus Line

S3 will connect communities along SR 522 with fast, reliable, battery-electric bus service from Shoreline South Station to Bothell via Kenmore and Lake Forest Park. 

Read More →
Ad Loading...
PRT bus stop with articulated bus.
Busby StaffFebruary 20, 2026

Pittsburgh Regional Transit Announces All-Door Boarding on the University Line

All-door boarding will allow passengers to pay while entering the front, middle, or rear doors of the University Line’s 60-foot articulated buses.

Read More →
Patrick Scully, president at Complete Coach Works.
Managementby StaffFebruary 18, 2026

Complete Coach Works Names Patrick Scully President

He succeeds the company founder, Dale Carson, who remains chairman of the board. 

Read More →
A MARTA articulated bus.
Busby StaffFebruary 13, 2026

Atlanta's MARTA Sets Date for 'A-Line' BRT Launch

The five-mile Rapid A-Line connects Downtown Atlanta to Capitol Gateway, Summerhill, Peoplestown, and the Beltline’s Southside Trail.

Read More →
Ad Loading...
A Picture of Ster Seating's Parent/Child transit seating product.
Technologyby StaffFebruary 10, 2026

Ster Seating, Maryland Transit Launch First Parent/Child Transit Seat in North America

The configuration uses Ster Seating's Gemini seat platform to create a family-friendly floor layout specifically engineered to accommodate parents traveling with young children.

Read More →