METRO Magazine Logo
MenuMENU
SearchSEARCH

Siemens awarded TriMet light rail vehicle contract

Per a $73 million contract, the 18 vehicles will be manufactured from start to finish at Siemens' rail vehicle manufacturing plant in Sacramento, Calif., a facility powered almost entirely by two megawatts of solar energy. The first new rail cars are expected to be delivered in August 2014.

May 27, 2013
2 min to read


Siemens has been awarded a $73 million contract to build 18 of its S70 light rail vehicles for TriMet in Portland, Ore. The vehicles will be manufactured from start to finish at Siemens' rail vehicle manufacturing plant in Sacramento, Calif., a facility powered almost entirely by two megawatts of solar energy. The first new rail cars are expected to be delivered in August 2014.

These 18 vehicles were ordered as a part of the Portland-Milwaukie Light Rail Transit Project. This extension includes a light rail alignment that travels 7.3 miles, connecting Portland State University in downtown Portland, inner Southeast Portland, Milwaukie and North Clackamas County. When it opens in September 2015, it will bring the light rail system to a total of 60 miles and 97 stations.

The extension includes 10 stations and the Portland-Milwaukie Light Rail Bridge spanning the Willamette River between the Oregon Health & Science University's South Waterfront Campus to the Oregon Museum of Science and Industry. This contract award will bring the total number of S70 light rail cars manufactured for TriMet by Siemens to 40. Siemens Rail Systems has a strong relationship with TriMet, having previously provided more than 100 low floor vehicles, including TriMet's newest fleet of 22 S70 light rail vehicles delivered in 2009.

The light rail project is a central element to the region's development, with about 22,000 households and 85,000 employees within walking distance of the stations. It's expected that 25,000 trips will be taken on the new line each weekday by the year 2030.

"This fifth generation of MAX light rail vehicles will include many improvements for riders and operators," said Dan Blocher, TriMet executive director of Capital Projects.

Compared with the Type 4 model, the Type 5 light rail vehicles for this project are more durable and have energy efficient LED interior lighting; improved HVAC for passenger comfort; more ergonomic cabs for operators; upgraded digital camera technology; improved ADA ramps for better accessibility, improved vehicle seating layout, more advanced vehicle diagnostics and easier maintenance.

The S70 Type 5 has a maximum operational speed of 55 miles per hour. Its low floor design enables passengers to board the train at street level, providing quicker and easier access for people of all abilities.

More Rail

An overhead rendering of the Austin Transit Partnership rail system.
Railby StaffApril 16, 2026

Austin Transit Partnership Names Contractor for Light Rail Operations Facility

The ATP board’s approval of the KAP team enables ATP to begin pre-construction activities, including advancing design, initiating permitting, and preparing the site for future construction.

Read More →
A Coach USA Van Hool CX 45 delivered by ABC Companies.
Busby StaffApril 15, 2026

ABC Delivers Van Hools to Coach USA and More in Biz Briefs

In METRO's latest installment, we take a look at the latest news from suppliers including Moovit, CAF, and more.

Read More →
A photo of an Amtrak train with a logo
Technologyby StaffApril 15, 2026

Amtrak Advances Plan for New Long-Distance Fleet

The railroad has issued a formal request for proposals to manufacturers for more than 800 new passenger railcars that will serve 14 long-distance routes nationwide.

Read More →
Ad Loading...
A headshot of Inez Evans Benson
Busby Alex RomanApril 15, 2026

Inez Evans Benson on Rethinking Transit Through Customer Experience

The WSP leader discusses why agencies must look beyond satisfaction metrics and take a more holistic, community-driven approach to service.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Technologyby StaffApril 14, 2026

Alstom Delivers First Multilevel III NJ TRANSIT Commuter Railcar

The delivery marks the first car in a 374‑vehicle order and begins the arrival of a new generation of higher‑capacity, more reliable, and more comfortable trains for one of the country’s busiest commuter rail systems.

Read More →
A BART train on the tracks.
Railby StaffApril 13, 2026

San Francisco's BART Breaks Multiple Records for Post-Pandemic Ridership in March

BART recorded 5,403,140 exits in March, making it the highest monthly ridership since the pandemic and surpassing the previous high set in October 2025 (5,346,890 exits).

Read More →
Ad Loading...
Ribbon cutting photo celebrating SEPTA's new Ardmore Station
Railby StaffApril 13, 2026

Philadelphia's SEPTA Celebrates New Ardmore Station

The station was rebuilt as part of SEPTA’s Station Accessibility Program, making it fully ADA accessible with new elevators, ramps, and high-level platforms.

Read More →
Two Metra locomotives on rail tracks.
Railby StaffApril 10, 2026

Metra Reaches New 10-Year Agreement with BNSF

The announcement highlights the long-standing partnership between the Class I railroad and the commuter rail system, dating back to Metra's creation in 1983.

Read More →
Ribbon cutting at Siemens' new North Carolina facility.
Railby StaffApril 9, 2026

Siemens Opens North Carolina Railcar Manufacturing Facility

Site construction is complete, production is underway, and the first locally built passenger coaches are on track for delivery in Summer 2026.

Read More →
Ad Loading...
Two MBTA railcars in station.
Railby StaffApril 9, 2026

MBTA Completes Key Red Line Signal Upgrade Weeks Early

Crews completed a significant portion of the testing required before commissioning the new, digital signaling system, which will bring important upgrades that strengthen Red Line service reliability for riders and provide Red Line Operations the ability to route trains more quickly, turn trains around faster, and recover from unplanned disruptions more efficiently, said MBTA officials. 

Read More →