METRO Magazine Logo
MenuMENU
SearchSEARCH

Amtrak Ill. high-speed corridor work continues

Illinois DOT and Union Pacific are performing another phase of upgrades to Illinois’ signature high-speed route, Chicago-St. Louis, for future 110 mph operation of Amtrak Lincoln Service trains.

July 24, 2013
Amtrak Ill. high-speed corridor work continues

Photo courtesy vxla

2 min to read


Photo courtesy vxla

The Illinois Department of Transportation and Union Pacific Railroad are performing another phase of upgrades to Illinois’ signature high-speed route, Chicago-St. Louis, for future 110 mph operation of Amtrak Lincoln Service trains.

The construction work includes the installation of new premium rail with concrete ties and stone ballast; upgrades to bridges, culverts and drainage; signal and wayside equipment installations and upgrades; and roadway-rail grade crossing improvements.

Ad Loading...

For eight days starting August 16, bridge and culvert upgrades north of Bloomington-Normal will lead Amtrak to charter buses for Lincoln Service (Trains 300-307) passengers at St. Louis, Alton, Carlinville, Springfield, Lincoln, Normal, Pontiac, Dwight, Joliet and Summit, Ill.

Amtrak Texas Eagle (Trains 21/321/421 & 22/322/422) will detour between Chicago and St. Louis for the same period, with alternate transportation in both directions between Joliet and St. Louis. Two more phases of planned 2013 construction will also require substitute transportation.

To expedite travel between Chicago and downstate, many of the buses will connect to and from Amtrak Illini and Saluki trains in Champaign-Urbana to avoid Chicago suburban highway congestion and downtown Chicago traffic.

These infrastructure improvements will allow Union Pacific crews to enable Amtrak to operate service at speeds up to 110 mph, an increase from the current maximum of 79 mph in effect over most of the route. Starting last Thanksgiving, the Dwight to Pontiac segment became the first part of the corridor to regularly experience trains traveling at speeds up to 110mph.

In the nine months since October 2012 (Amtrak Fiscal Year 2013), ridership on the Chicago-St. Louis corridor has increased by nearly 23,000 when compared with the same period a year ago, totaling more than 551,000 passengers — an increase of 4% that sets the stage for another record breaking year, according to Amtrak.

 

Topics:AmtrakRail

More Rail

MTA Advances Accessibility Improvements in Brooklyn
Paratransitby StaffJune 17, 2026

New York MTA Leverages Zoning Program to Advance Station Accessibility

Accessibility enhancements at Nevins St Station will be financed through a development agreement tied to the MTA's Zoning for Accessibility initiative.

Read More →
Six-Year Plan Boosts Virginia Transit, Rail Investments
Managementby StaffJune 17, 2026

Virginia's $28.5B Transportation Plan Targets Transit and Rail

Approved by the Commonwealth Transportation Board, the program supports ongoing infrastructure projects while providing new investments in transit, state of good repair and transportation alternatives.

Read More →
Security and Safetyby StaffJune 16, 2026

DOT: Brightline Corridor Incidents Fall 30% Following Federal Safety Upgrades

Safety improvements funded through a $25 million federal investment are credited with reducing trespassing and train-vehicle collisions along the Brightline Florida corridor.

Read More →
Ad Loading...
An LA Metro D Line train in Union Station
Managementby StaffJune 16, 2026

D Line Expansion Fuels Growth Across LA Metro's Rail System

Weekend rail ridership was especially strong, soaring 18% as riders embraced expanded access to jobs, entertainment, dining, and cultural destinations, said the agency. Total system ridership for May, including bus and rail, was 26,966,657.

Read More →
A user demonstrating Metrolink's contactless fare payment pilot.
Technologyby StaffJune 12, 2026

Southern California's Metrolink Debuts Contactless Fare Payment Pilot

Customers traveling between Redlands and Los Angeles can now tap their preferred payment method, including a credit or debit card, mobile wallet, or wearable device, at station validators before boarding and again while exiting.

Read More →
A BART train on the tracks.
Managementby StaffJune 12, 2026

California's BART Approves FY27 Budget While Maintaining Service Levels

The budget covers July 1, 2026, through June 30, 2027, a period when pandemic emergency funds run out, the District faces a structural deficit of $375 million, and a regional transit funding measure may appear on the November ballot.

Read More →
Ad Loading...
A rendering of the Amtrak New York Penn Station renovation
Railby StaffJune 9, 2026

Penn Station Transformation Advances with Design Unveiling

The historic redesign will transform the busiest transit hub in the Western Hemisphere from the tracks to the street level, creating a more efficient, cleaner, and functional experience for more than 600,000 daily commuters and millions of visitors.

Read More →
Groundbreaking event for Second Avenue Subway Phase 2 TBM construction.
Railby StaffJune 9, 2026

Second Avenue Subway Phase 2 Advances into Major Construction Stage

New York Governor Kathy Hochul joined leadership from the MTA, elected officials, and Harlem community leaders to break ground on the major construction stage of the transformative Second Avenue Subway Phase 2 project.

Read More →
A man sits in a passenger rail seat and looks at his phone.
Railby Elora HaynesJune 8, 2026

The Invisible Infrastructure of Passenger Flow

What a seat reservation system on Austria’s Railjet trains reveals about the future of rider experience, and why U.S. agencies should pay attention.

Read More →
Ad Loading...
Aerial view of Caltrain's electric service.
Railby StaffJune 5, 2026

Caltrain Board Approves FY27 Budget, Endorses Efficiency Measures

The move ensures Caltrain service will continue operating as usual in the near term, but long-term financial challenges remain for the rail agency absent a new revenue source.

Read More →