San Diego kicks off $660M trolley renovation
Modernizing the Blue Line, the most heavily used transit service in the region, with an average daily ridership of more than 50,000. The overhaul also includes raising 35 station platforms to accommodate low-floor vehicles, replacing outdated rail and overhead wires, and improving street crossings, switching, and signaling.

Photo courtesy Trickymaster, Wikimedia Commons

Photo courtesy Trickymaster, Wikimedia Commons
San Diego Metropolitan Transit System (MTS) began the final phase of its $660-million Trolley Renewal project, kicking off construction to modernize the Blue Line, the most heavily used transit service in the region, with an average daily ridership of more than 50,000.
“In less than 18 months, the oldest segment on the MTS trolley system will be transformed into the newest,” said Harry Mathis, chairman of the MTS board of directors. “And the primary beneficiaries of all these improvements are our customers.”
The Blue Line, which has been one of the most successful light rail lines in North America, will be completely renovated. One-dozen stations, from Barrio Logan to San Ysidro, will be elevated to afford customers almost level boarding. Access between bus and trolley services will be enhanced. New shelters, closed-circuit television, next-arrival signage, enhanced lighting, and a smoother ride will all improve the customer experience.
The Trolley Renewal project is funded by a variety of sources, including TransNet, the regional half-cent sales tax for transportation administered by SANDAG; California Proposition 1B and 1A bond money; and the American Reinvestment and Recovery Act, commonly known as the federal stimulus package.
SANDAG began the project in partnership with MTS in fall 2010 and is scheduled to finish the work in 2015. The project is bringing 65 low-floor trolley cars to the region, improving access for all riders. The new vehicles provide nearly level boarding, so time-consuming mechanical lifts will no longer be needed. The ultimate result will be faster boarding for all passengers and improved on-time performance. These new vehicles are already being used by thousands of passengers each day on the Green and Orange Lines.
The trolley system marks its 32nd anniversary this week as many of its original components are nearing the end of their useful lives.
The system-wide overhaul also includes raising 35 station platforms to accommodate the low-floor vehicles, replacing outdated rail and overhead wires, and improving street crossings, switching, and signaling. In addition, the project will also expand freight capacity between Downtown San Diego and the border area.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →