San Diego Metropolitan Transit System (MTS) began the final phase of its $660-million Trolley Renewal project, kicking off construction to modernize the Blue Line, the most heavily used transit service in the region, with an average daily ridership of more than 50,000.
“In less than 18 months, the oldest segment on the MTS trolley system will be transformed into the newest,” said Harry Mathis, chairman of the MTS board of directors. “And the primary beneficiaries of all these improvements are our customers.”
The Blue Line, which has been one of the most successful light rail lines in North America, will be completely renovated. One-dozen stations, from Barrio Logan to San Ysidro, will be elevated to afford customers almost level boarding. Access between bus and trolley services will be enhanced. New shelters, closed-circuit television, next-arrival signage, enhanced lighting, and a smoother ride will all improve the customer experience.
The Trolley Renewal project is funded by a variety of sources, including TransNet, the regional half-cent sales tax for transportation administered by SANDAG; California Proposition 1B and 1A bond money; and the American Reinvestment and Recovery Act, commonly known as the federal stimulus package.
SANDAG began the project in partnership with MTS in fall 2010 and is scheduled to finish the work in 2015. The project is bringing 65 low-floor trolley cars to the region, improving access for all riders. The new vehicles provide nearly level boarding, so time-consuming mechanical lifts will no longer be needed. The ultimate result will be faster boarding for all passengers and improved on-time performance. These new vehicles are already being used by thousands of passengers each day on the Green and Orange Lines.
The trolley system marks its 32nd anniversary this week as many of its original components are nearing the end of their useful lives.
The system-wide overhaul also includes raising 35 station platforms to accommodate the low-floor vehicles, replacing outdated rail and overhead wires, and improving street crossings, switching, and signaling. In addition, the project will also expand freight capacity between Downtown San Diego and the border area.
San Diego kicks off $660M trolley renovation
Modernizing the Blue Line, the most heavily used transit service in the region, with an average daily ridership of more than 50,000. The overhaul also includes raising 35 station platforms to accommodate low-floor vehicles, replacing outdated rail and overhead wires, and improving street crossings, switching, and signaling.

Photo courtesy Trickymaster, Wikimedia Commons
More Rail

Amtrak Announces Community Grants for Projects Near Baltimore’s New Frederick Douglass Tunnel
Amtrak will open grant applications March 23 for community projects near the Frederick Douglass Tunnel alignment in Baltimore as part of a $50 million investment tied to the B&P Tunnel Replacement Program.
Read More →
Amtrak Marks Restoration of Two South Carolina Stations
The Denmark Station $2.3 million construction investment project includes a new 280-foot concrete boarding platform, built eight inches above the top of rail, for improved accessibility for passengers with disabilities and families with small children and much more.
Read More →
NJ Transit, Amtrak Prepare to Open First Track on New Portal North Bridge
The new bridge will begin carrying passenger trains on March 16, replacing a 116-year-old swing bridge that has long caused delays.
Read More →
Caltrain Adopts Corridor-Wide Right-of-Way Safety Strategy
Caltrain and its partners have implemented safety improvements at specific locations in response to known risk conditions, operational needs, and available funding since the agency’s founding.
Read More →
Building a National Framework for Transit Safety and Consistency
On a recent episode of METROspectives, METRO Magazine’s Executive Editor Alex Roman sat down with Ana-Maria Tomlinson, Director of Strategic & Cross-Sector Programs at the CSA Group, to explore a bold initiative aimed at addressing those challenges: the development of a National Code for Transit and Passenger Rail Systems in Canada.
Read More →
FTA Invests $686M to Modernize Aging Rail Stations
Competitive FTA grants will support accessibility upgrades, family-friendly improvements, and cost-efficient capital projects at some of the nation’s oldest and busiest transit hubs.
Read More →
MBTA Updates Rail Modernization Plan to Expand Reliability and Accessibility
The strategy outlines near- and long-term upgrades to ease congestion, support housing growth, and advance statewide climate goals.
Read More →
LA Metro Sets D Line Subway Extension Launch Date
The 3.92-mile addition will soon take riders west beyond its current Wilshire and Western station in Koreatown, continuing under Wilshire Boulevard through neighborhoods and communities including Hancock Park, Windsor Square, the Fairfax District, and Carthay Circle into Beverly Hills.
Read More →
Boston's MBTA Marks Progress in Regional Rail Modernization
The procurement advances the agency's broader efforts to modernize its rail fleet and position Regional Rail for long-term improvement.
Read More →
Amtrak Sets New Course for Long-Distance Fleet Renewal
Under the plan, all long-distance routes will transition to a universal single-level fleet, replacing today’s mix of bi-level and single-level equipment.
Read More →
