METRO Magazine Logo
MenuMENU
SearchSEARCH

CTA fires operator who derailed train, launches new scheduling rules

She had been on the job for 60 days and admitted to dozing off before the crash, as well as overrunning a station in February, NTSB officials say. The agency may terminate an operator for two serious safety violations under its contract with the union for those workers. It is also setting limits on hours of operation duty and increasing minimum rest time.

April 4, 2014
3 min to read


CHICAGO — A Chicago Transit Authority (CTA) spokeswoman told Reuters that on Friday the agency fired the train operator who fell asleep while operating the train that jumped the track and scaled the escalator and stairs at the O’Hare International Airport station on March 24.

According to the National Transportation Safety Board, the operator, who has not been identified, had been on the job for 60 days and admitted to dozing off before the crash, as well as overrunning a station in February.

The CTA spokeswoman added that the transit authority may terminate an operator for two serious safety violations under its contract with the union for those workers. For the full story, click here.

The CTA also announced on Friday changes in the scheduling of rail operators, the result of a comprehensive internal agency review of scheduling procedures following the incident.

The CTA has historically followed well-established scheduling principles and practices that are very similar to those of every other transit agency in the country, according to the agency. However, it voluntarily and immediately began conducting an internal analysis of those policies to determine if improvements could be made.

“Safety is our highest priority at the CTA,” said CTA President Forrest Claypool. “Any time an incident like this occurs, we take very seriously the responsibility of thoroughly reviewing all aspects of what happened — including longstanding policies and practices. In this instance, there were changes we could make that are appropriate and that further maximize safety for our customers and for our employees.”

The proposed changes include:

•    Setting a maximum of 12 hours of actual train-operations duty (including layover times at terminals and other non-driving rail duties) for rail operations employees in a 14-hour time period. Currently, there is no maximum.

•    Increasing the minimum time of rest between shifts to 10 hours from eight hours.

•    Require all rail operations employees to take at least one day off in any seven-day period. Currently, there is no limit.

•    For new operators in the first year of operating a train, limit weekly hours operating a train to 32 hours. As they do now, these employees will work other rail-related duties besides operating trains in their other work hours. Currently, there is no limit.

These changes will make CTA scheduling guidelines as stringent, and in most cases more stringent, than its peer transit agencies nationwide, agency officials said.

The CTA has already implemented two other changes at the O’Hare Blue Line station: reducing the speed limit of approaching trains to 15 mph from 25 mph, and moving “trip arms,” devices that will stop a train traveling above the speed limit, further back from the end of the platform.

Additionally, the CTA will repeat its fatigue awareness training for all rail operators.

The CTA is continuing to work with the NTSB in its investigation into the incident.

More Management

AAAHI receiving METRO's Innovative Operator of the Year Award
Motorcoachby Alex RomanSeptember 16, 2026

METRO Opens Submissions for 2026 Motorcoach Awards

Nominations are now being accepted for METRO Magazine’s Operator of the Year and Innovative Operator of the Year awards.

Read More →
A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
Transit Leaders Gather for National Safety Summit
Security and Safetyby Alex RomanSeptember 16, 2026

Transit Agencies Highlight Safety Gains at National Summit

Leaders from 15 major transit systems shared crime-reduction results and safety initiatives while discussing the role of continued federal support.

Read More →
Ad Loading...
A blue and white graphic with text reading "NITA Names New Leadership, Expands Reduced-Fare Program."
Managementby Staff and News ReportsSeptember 14, 2026

NITA Names New Leadership, Expands Reduced-Fare Program at First Board Meeting

The new regional transit authority appointed its first board chair and interim executive director while extending reduced fares across CTA, Metra, and Pace for eligible riders.

Read More →
From Checklists to Better Outcomes
TechnologySeptember 11, 2026

Beyond the Checklist: A Structured Approach to Transit Maintenance

Reliability-Centered Maintenance helps transit agencies move beyond routine checklists to focus limited resources on the assets and failures that have the greatest impact on safety, reliability, and service.

Read More →
A red, white, and blue graphic with the APTA logo and text reading "APTA Nominates 2026-2027 Chair & Vice Chair."
Managementby Staff and News ReportsSeptember 10, 2026

APTA 2026 Nominating Committee Selects Leadership Slate, Names Chair and Vice Chair Nominees

Leadership changes will help shape the association’s priorities and its representation of the transportation industry during the 2026–2027 term.

Read More →
Ad Loading...
DART's light rail station at 8th and Corinth
Security and Safetyby Alex RomanSeptember 10, 2026

DART Launches Major Security, Fare Enforcement Initiative

The 90-day demonstration will deploy coordinated security teams at five light rail stations while testing controlled access and gathering data to guide future investments.

Read More →
STraffic White Paper Cover Learn about delivering 1300 gates at 91 stations while managing fare evasion. Explore the large scale deployment, solution customization and real-world results that affect the region. Prepare for deployment in your region now.
SponsoredSeptember 9, 2026

Advancing Fare Collection Through Technology and Innovation

Learn about delivering 1300 gates at 91 stations while managing fare evasion. Explore the large scale deployment, solution customization and real-world results that affect the region. Prepare for deployment in your region now.

Read More →
A TransLink train goes by a large FIFA World Cup soccer ball structure.
Managementby Elora HaynesSeptember 8, 2026

Game Day in Motion: Moving Millions During the 2026 World Cup

Between packed transit stations and team motorcoaches, see how agencies and operators across North America tackled the transportation demands of the 2026 FIFA World Cup.

Read More →
Ad Loading...
A blue and white graphic with text reading "Surface Transportation Averts Shutdown, Leaves Transit Funding Gap."
Managementby Elora HaynesSeptember 4, 2026

Surface Transportation Extension Averts Shutdown, Leaves Transit Funding Gap

The stopgap keeps federal transportation programs moving, but missing advance funding could complicate the transit and rail projects agencies are planning next.

Read More →