Rail

Blackout halts N.Y. subway, train service

Posted on August 15, 2003

An estimated 350,000 riders were stranded on New York subways and thousands more were stuck on Metro-North and Long Island Rail Road trains after a massive power outage left much of the northeast in the dark. The blackout, which occurred at 4:11 pm on Thursday, was caused by a power grid failure. Power was restored by Friday morning to sections of all five boroughs. Transit officials, said the restoration of power to about half of New York wasn't enough to bring the subways back, and said they likely would remain down through the evening rush hour. On the first day of the black out, subway passengers were trapped in pitch-black, sweltering tunnels, forced to clamber across the tracks and through trapdoors to safety and daylight, reported the Daily News. Transit Authority spokesman Paul Fleuranges said subway workers did a good job of keeping riders calm, sweeping the tubes and leading panicky commuters to the streets, according to the paper. By nightfall, the 720-mile system was still out of service, with officials saying it would take six to eight hours after all power was restored to get the trains running again. The cause of the blackout, which knocked out service in parts of eight states and Canada in just nine seconds, is still a mystery.

View comments or post a comment on this story. (0 Comments)

More News

CRRC announces ship date for MBTA pilot cars

The company is the first Chinese railcar builder to enter into the U.S. rail car manufacturing market.

STV, WSP USA to support L.A. Metro rail vehicle acquisition

Acquisition of new heavy rail vehicles and associated equipment that will play a key part in Metro’s systemwide rail expansion over the next decade.

Stadler breaks ground on railcar manufacturing plant in Salt Lake City

Its 62-acre property boasts 75,000 square feet of production space for the bogie, main, pre- and final assembly of single- and bi-level trains.

Stadler, Fort Worth Transportation Authority unveil 1st U.S. FLIRT train

The new commuter trains for TEXRail have been designed to reach maximum speeds of 81 mph and boast a coupled length of 266 feet each.

Design-build taking transit into the future

Design-build minimizes risk, reduces delivery time, keeps budgets in line, and mitigates funding partner concerns throughout project duration. With traditional design-bid-build, owners, designers, and contractors are segregated from design concept to final construction.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close