Rail

Amtrak mismanaged high-speed project, GAO says

Posted on March 10, 2004

The goal of three-hour train service between Boston and New York was not met because Amtrak mismanaged the project, according to a report released Monday by the U.S. General Accounting Office (GAO). In 1992, Congress ordered the Transportation Department to develop a plan for reducing the train trip between the two cities from four hours to three hours or less, reported the Associated Press. A total of $3.2 billion was spent on the project through March 2003. The trip now takes three hours, 24 minutes. According to the GAO report, Amtrak didn't develop a long-term plan, anticipate problems or coordinate with state governments and commuter railroads that use the same tracks. The report also said the railroad has yet to make infrastructure improvements, including straightening curves and replacing movable bridges, said the news service. Amtrak President David Gunn said in a letter that the report ignored Amtrak's problems with contractors. Gunn also said that it is generally acknowledged that the only way to cut travel time between the Boston and New York is to offer nonstop service.

View comments or post a comment on this story. (0 Comments)

More News

Alstom debuts world's first hydrogen train entering passenger service

The zero-emission Coradia iLint, which debuted in Lower Saxony, Germany, can reach up to 140 km/h (90 mph).

WMATA announces contracting opportunity for Silver Line extension

Under the agency's plan to "Keep Metro Safe, Reliable and Affordable," the use of competitive contracting is recommended as a way to control operating and maintenance costs

Amtrak Pacifc Surfliner, MLB team up for rail safety awareness

Partners with San Diego Padres, Los Angeles Angels and California Operation Lifesaver to highlight the importance of safety around train tracks.

Zmudzinski to lead national rail systems at WSP

Will lead the firm’s transit and rail systems engineering team and support business development across the U.S.

4 teams submit design-build bids for Foothill Gold Line light rail project

Includes technical approach to completing the design and construction of the project, their management method, and financial bid.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation