Rail

ARRA to fund Seattle transit center

Posted on May 15, 2009

On Friday, Sound Transit and its partners broke ground on the Mountlake Terrace Freeway Station. Federal stimulus money and a regional mobility grant will help fund the $40.9 million facility.

 

The new project in the center of I-5 will enable buses to pick up and drop off Mountlake Terrace commuters inside the freeway median.

 

Set to open in 2011, the project features a pedestrian bridge connecting the new bus platforms with Community Transit’s new Mountlake Terrace Transit Center and park-and-ride garage. The project was planned in partnership with the city of Mountlake Terrace and Community Transit. Construction will be managed by the Washington State Department of Transportation.

 

The $4.6 million in federal stimulus dollars for the Mountlake Terrace project is part of $131 million in federal stimulus funds for transit projects in the Puget Sound region. Sound Transit will receive a total of $23 million for five shovel-ready construction projects in communities throughout the Sound Transit District.

 

The project includes northbound and southbound direct access on- and off-ramps exclusively for buses, making it easier and faster for them to enter and exit the freeway and pick up passengers without being slowed down by local traffic. Along with the South Everett Freeway Station, which opened last September, the Mountlake Terrace Freeway Station will be the second of Sound Transit’s Snohomish County facilities located in the freeway median and the fourth with direct freeway access ramps.

 

View comments or post a comment on this story. (0 Comments)

More News

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

Alstom to deliver to Sydney Citadis X05

Company is responsible for the integrated tramway system, which includes the design, delivery and commissioning of 30 coupled Citadis X05 trams; power supply equipment, including APS -ground power supply; signaling systems, the energy recovery system HESOP, depot equipment and maintenance.

Ann Arbor transit official urged MDOT not to lease railcars

In 2009, more than a year before MDOT signed a contract to lease and refurbish the double-decker railcars, which since have cost the state about $12 million, an Ann Arbor transit official told MDOT the cars were not suitable for proposed commuter rail services because they didn't meet federal requirements.

Hitachi purchases manufacturer of Honolulu's rail system

Finmeccanica owns all of AnsaldoBreda, which is unprofitable, and 40% of Ansaldo STS, which is profitable, according to the report. The two Ansaldo companies formed a joint venture, Ansaldo Honolulu JV, to design and build the 20-mile, 21-station elevated train system for Oahu under a $1.4 billion contract.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close