Rail

Alstom, Paris transit, partner on energy storage

Posted on July 7, 2009

The RATP and Alstom Transport have joined forces for a year-long trial of a new onboard energy storage solution, supercapacitor technology, fitted to a carriage on the T3 tramway in Paris.

 

This system is being tested as part of the STEEM (Maximised Energy Efficiency Tramway System) project. It will enable the trams to run without catenary power, allowing them to be integrated more effectively into the urban environment and generate energy and infrastructure savings.

 

In order to respond even more effectively to the specific needs of each local authority, Alstom is now exploring one of the most promising avenues in the field of catenary-free solutions, supercapacitor technology, in partnership with the RATP. This technology will be tested under commercial operating conditions for a year on one of the 21 Citadis carriages running on the T3 line. This project, called PREDIT, is subsidized by the French public body responsible for environmental and energy management, ADEME.

 

The RATP's entire metro, RER and tram fleet is equipped with rolling stock that ensures that energy generated during braking is recovered to the electric power network.

View comments or post a comment on this story. (0 Comments)

More News

Proposed downtown L.A. streetcar gets big boost

Supporters say ridership on the 3.8-mile service could reach 6,000 people per day.

Wabtec completes majority ownership of Faively Transport

The combination creates one of the world's largest public rail equipment companies, with revenues of about $4.2 billion and a presence in all key transit and freight rail markets worldwide.

Bombardier plant hosts royal visit from HRH The Duke of Cambridge

During his visit, His Royal Highness was given a site tour and inspected the company's assembly of Elizabeth line trains, where he met manufacturing, welding and painting apprentices.

Mich. State railway management certificate program updates offerings

The updated program treats the railway as a system, covering freight supply chain integration and efficient/value-added transportation of passengers.

WMATA proposes cutting late night rail service

Additionally, the earliest trains on Sunday would start at 8 a.m., while the start times for trains on weekdays and Saturdays would remain at 5 a.m. and 8 a.m., respectively.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close