Rail

Alstom to supply tramways to Brazil, Istanbul

Posted on September 8, 2009

[IMAGE]Citadis-Brasilia-HDFull.jpg[/IMAGE]The city of Brasilia has signed a contract with the Bastram consortium (made up of Alstom Transport, TC/BR, Mendes Jr. and Via) for phase 1 of a tramway project. Alstom’s share of this first phase is approximately $200.6 million.  

The project includes the supply of 16 Citadis tramways and the construction of a 4.9-mile stretch of track (.74 miles of which will use APS ground-level power supply technology). This technology provides power to tramways without the use of catenary systems, which helps preserve the urban environment and architectural heritage of city centers.

 

The tramways supplied to Brasilia will be able to carry more than 400 passengers per trainset- the equivalent of more than six buses. Alstom will also provide Brasilia with electric power systems, as well as telecommunication and ticket distribution systems.

 

Meanwhile, on Sept. 1, Alstom delivered the first of 37 Citadis tramways ordered by the Istanbul Metropolitan Municipality in Turkey. Over the next few weeks the trams will undergo a series of tests on the network run by Ulasim, Istanbul’s urban transport operator. The remaining trams will be delivered between the end of 2009 and mid-2010. Alstom will also supply a driving simulator to help train future tram drivers.

 

The tramway is the first to be equipped with the new Ixege bogies developed by Alstom. This technology combines a swivel function and a low floor, enabling this new generation tram to be used on any type of track, whether the network is new, or has already been in use for a number of years.

 

View comments or post a comment on this story. (0 Comments)

More News

San Diego debuts restored trolley for Silver Line

The 68-year old streetcar was acquired as part of a trade with United Transportation Corporation (UTC)/Rail Air Sources (RAS) in exchange for two Siemens U-2 light rail vehicles that were phased out of the MTS fleet.

34 properties purchased for $70M along Honolulu rail transit route

HART's property acquisitions range in price from $22,304 to about $6 million. In June, HART said that it has to acquire 213 properties for the project, and that it had an acquisition budget of $222 million.

Alstom opens new Brazilian Citadis production line

The new production facility will serve the Brazilian market and, in a near future, the Latin America region where a number of new tramway projects are emerging. When fully operational, the facility will employ around 150 people.

FRA ramps up campaign to address nationwide grade crossing safety

The first phase of the effort calls upon local law enforcement agencies to show a greater presence at grade crossings, issue citations to drivers that violate rules of the road at crossings and consider rapid implementation of best practices for grade crossing safety.

S.C. city seeking elevated transit line bids

The first phase of the plan would construct a four-mile section elevated guideway above a section of abandoned railroad tracks. The first section of the elevated railway could connect Clemson University's International Center for Automotive Research campus with downtown Greenville.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close