Rail

Monterey, Calif., taps light rail for transit corridor

Posted on October 30, 2009

[IMAGE]Monterey-Branch-Line-full-1.jpg[/IMAGE]Monterey County, Calif., residents are one step closer to riding light rail between Monterey and Marina after the Transportation Agency for Monterey County (TAMC) selected light rail as the locally preferred alternative for the Monterey Branch Line transit corridor.

The 16-mile corridor extends between Monterey and Castroville on the publicly owned tracks adjacent to Highway 1.

For the past few years, TAMC board members have been discussing and reviewing the benefits to bus rapid transit (BRT) or light rail transit for the planned corridor. Light rail was selected based on its ability to provide superior transportation in the long-term while best meeting the vision and future plans for each of the peninsula cities, according to agency officials.

Light rail vehicles hold more riders than BRT vehicles and, unlike BRT, have the ability to add train cars at a nominal operating cost, which will be beneficial when ridership increases in the future, said TAMC officials.

This capability to respond to long-term growth is an essential feature of this mode choice. With tracks in the corridor, intercity rail can one day run from San Francisco to
Monterey, providing a fast and efficient way of getting to and from San Francisco.

The first phase of the project will run between Monterey and north Marina with key
stations in Monterey, Seaside, Sand City, Marina/CSUMB, and connecting bus service to Pacific Grove and Carmel to the south and Salinas to the east. Later phases will extend service to the planned commuter rail station in Castroville and increase the frequency of trains.

The total capital cost for Phase 1 of the project is $128.5 million. One of the next steps for the project will be to design computer simulations of what the light rail vehicles will look like running on the corridor through the cities of Monterey and Marina. These visualizations were requested by the cities to help illustrate how light rail will fit in with their communities.

The TAMC will also hold meetings with each of the cities to determine the best design and location for the transit stations, in particular where the terminus of the line will occur in Monterey.

Then, TAMC will complete the federal and state environmental review documents in
preparation for requesting a major contribution of federal transit funds for construction.
Start of service is planned for early 2015.

View comments or post a comment on this story. (0 Comments)

More News

FRA invests $21.2M in PTC, grade crossing safety, passenger rail

Grants awarded are part of a Notice of Funding Availability it issued in July 2014 to distribute new FY14 Omnibus funding as well as unobligated funds from the High-Speed Intercity Passenger Rail Program.

Metra adopting 'confidential close call reporting system'

According to the FRA, which has promoted the adoption of the system by a handful of railroads so far, the system complements existing safety programs, builds a positive safety culture, creates an early warning system, focuses on problems instead of people, provides an incentive for learning from errors and targets the root cause of an issue, not the symptom.

Cost of 3-week Cincinatti streetcar delay could total $2M

Additionally, the Southwest Ohio Regional Transit Authority has reduced its estimates by $569,000 for both streetcar fare revenue and what it believes it can capture from those who want to advertise on the vehicles.

The case for driverless trains by the numbers

Some of the benefits discussed by a CityLab report, include a 70% savings in staff, higher frequencies, significant operational savings and more room for passengers.

State lawmakers urge Metro Transit to step up fare enforcement

While an audit found that one of every 10 light rail passengers may not be paying fares, Metro Transit reports 94% compliance on its Green Line and 97% compliance on its Blue Line. Moving away from an honor system and installing turnstiles could cost the agency $107 million, according to the report.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The resource for managers of class 1-7 truck Fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close