Rail

1,207 customers board Minn. Northstar on first day

Posted on November 16, 2009

On Monday, Metro Transit reported that 1,207 paying passengers rode Northstar commuter rail for first time as the 40-mile service launched this weekend between Big Lake and downtown Minneapolis.

Assuming morning riders return home this afternoon, first-day totals will reach 2,414 rides, 70 percent of average weekday ridership expected during the first year.

Northstar offers five morning rush-hour trips to Minneapolis and five trips home in the afternoon as well as one reverse-commute trip. Three roundtrips are available on Saturdays and Sundays.

"Today was a good beginning to a service that has been nearly 13 years in the making," said Metro Transit GM Brian Lamb. "With speeds up to 79 mph, Northstar offers a fast trip and, more importantly, a consistent trip - 51 minutes end-to-end regardless of weather and nearby road congestion. Northstar provides a viable alternative to driving alone in a car for those who live along the Highway 10 corridor."

Metro Transit posted staff members at each of Northstar's six stations - Big Lake, Elk River, Anoka, Coon Rapids, Fridley and Target Field in Minneapolis - to help customers get acquainted with Northstar service. Those staff members will be on hand through Wednesday and again over the weekend. Then, as intended, Northstar will become a self-service operation.

Each train trip consists of a locomotive and four passenger cars, with each car seating about 140 customers. Passenger cars have three seating levels, work tables, electrical outlets and an on-board restroom. Each car can accommodate two bicycles and is fully accessible for persons with disabilities.

Each suburban station has adjacent park-and-ride facilities, and platforms are equipped with cameras, emergency telephones, enclosed shelters, heating and other amenities.

The $317 million Northstar rail project was designed and constructed by the Minnesota Department of Transportation. It is owned by the Met Council and managed by Metro Transit, an operating division of the Council.

View comments or post a comment on this story. (0 Comments)

More News

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

Alstom to deliver to Sydney Citadis X05

Company is responsible for the integrated tramway system, which includes the design, delivery and commissioning of 30 coupled Citadis X05 trams; power supply equipment, including APS -ground power supply; signaling systems, the energy recovery system HESOP, depot equipment and maintenance.

Ann Arbor transit official urged MDOT not to lease railcars

In 2009, more than a year before MDOT signed a contract to lease and refurbish the double-decker railcars, which since have cost the state about $12 million, an Ann Arbor transit official told MDOT the cars were not suitable for proposed commuter rail services because they didn't meet federal requirements.

Hitachi purchases manufacturer of Honolulu's rail system

Finmeccanica owns all of AnsaldoBreda, which is unprofitable, and 40% of Ansaldo STS, which is profitable, according to the report. The two Ansaldo companies formed a joint venture, Ansaldo Honolulu JV, to design and build the 20-mile, 21-station elevated train system for Oahu under a $1.4 billion contract.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close