Rail

D.C. Metro to use rail carts for emergency response

Posted on March 25, 2010

[IMAGE]D-C-Metro-emergency-cart-full.jpg[/IMAGE]The Washington Metropolitan Area Transit Authority (Metro) will use Mobile Emergency Response Vehicles (MERV), new motorized emergency vehicles to help agency and emergency services personnel respond to the scene of an emergency in the Metrorail system quickly and efficiently.

First responders will be able to use the vehicles to move equipment along the tracks to the scene of a Metrorail emergency, as well as safely transport people who are unable to walk out of an incident area. The MERVs run on rail tracks up to 10 mph and can turn what could be a 45-minute walk for firefighters loaded with gear into a four-minute ride.

MERVs are battery-operated, motorized carts that run along Metrorail tracks. They are constructed of lightweight aluminum, are foldable and portable. First responders are able to carry and assemble the cart at the scene of an emergency.

“An emergency situation in the Metrorail system would mean that power has been turned off on the rail. Because the MERV runs on battery power, we would be able to drive the vehicle on the tracks and respond quickly to the scene,” said Metro Director of Emergency Management Peter LaPorte.

Metro currently has four MERVs and is training local fire and emergency response personnel on how to assemble and operate the carts in the Metrorail system. Twenty-two additional units are expected and will be stored at key locations throughout the rail system for use in emergencies.

Metro has evacuation carts stored throughout the system that first responders manually push along the tracks. It first tested an electric cart in 2006 and realized the value in having a motorized response vehicle. Metro worked with area first responders in the region to find a cart that suited the needs of the first responders and Metro personnel.

MERVs were used by the London Fire Brigade in response to the terrorist attack on London transit in 2005. Members of the Council of Government’s Fire Chiefs Passenger Rail Safety Subcommittee saw the motorized rescue carts at a conference designed to evaluate lessons learned in London. The group obtained a prototype of the MERV in 2008 and recommended modifications. The MERVs currently on site have been customized for the Metrorail system.

U.S. Department of Homeland Security Urban Area Security Initiative provided an $860,000 grant to buy 26 MERVs for use in Metrorail tunnels throughout the 106-mile rail system. The grant was obtained by the Metropolitan Washington Council of Governments Fire Chiefs and is managed by the Arlington County Fire Department.

Metro and its regional partners will test the MERVs during an emergency response exercise at the Rosslyn Metrorail station on Sunday, March 28. Fire and rescue personnel from Arlington will take the carts into the Metrorail tunnel between the Rosslyn and Foggy Bottom Metrorail stations in a mock rescue of passengers injured after a simulated explosion on a Metrorail train. The overall exercise is designed to test the integrated response and incident coordination needed to mitigate a major emergency in the Metrorail system.

 METRO TV: To watch a video of the MERV in action, click here.

View comments or post a comment on this story. (0 Comments)

More News

Alstom secures power supply contract for Kochi metro in India

This contract includes high voltage cabling from the state grid for the new 16-mile metro line. Alstom is the main supplier of Kochi metro after it has been awarded previous orders for 25 Metropolis trainsets, signalling, telecom and electrification. Commercial service is scheduled to begin in March 2016.

Bombardier signs maintenance contract for National Express Essex system

The contract, which is for a ten-year period with the option to extend another 5 years, covers maintenance and spare parts on 74 four-car Class 357 ELECTROSTAR trains and is valued at approximately $213 million.

MBTA gets winter weather advice from 'peer' cities

Suggestions included using special diesel-powered vehicles to clear snow from tracks, as well as using deicing chemicals to prevent the third rail from freezing and losing contact with the trains.

Chicago Transit replacing airport escalator damaged in train wreck

The train wreck, which occurred in the early morning of March 24, 2014, when the operator allegedly fell asleep, injured more than 30 people and caused roughly $9 million in damage. The lead railcar had to be cut up to remove it from the escalator.

DART takes delivery of first streetcar for new service

The vehicle, which was a designed and built by Brookville Equipment Corp., will be the first streetcar in the U.S. that utilizes wireless traction power.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The resource for managers of class 1-7 truck Fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close