Rail

NTSB: D.C. Metro’s safety problems preceded crash

Posted on July 27, 2010

WASHINGTON, D.C. — The Associated Press reports that on Tuesday a federal official claimed D.C. Metro’s safety problems extended past a signaling system failure, which was determined to be the cause of the 2009 Metrorail crash that killed nine people. Previous accidents, some of which killed employees, foreshadowed the deadly crash. For the full story, click here.

View comments or post a comment on this story. (0 Comments)

More News

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

Alstom to deliver to Sydney Citadis X05

Company is responsible for the integrated tramway system, which includes the design, delivery and commissioning of 30 coupled Citadis X05 trams; power supply equipment, including APS -ground power supply; signaling systems, the energy recovery system HESOP, depot equipment and maintenance.

Ann Arbor transit official urged MDOT not to lease railcars

In 2009, more than a year before MDOT signed a contract to lease and refurbish the double-decker railcars, which since have cost the state about $12 million, an Ann Arbor transit official told MDOT the cars were not suitable for proposed commuter rail services because they didn't meet federal requirements.

Hitachi purchases manufacturer of Honolulu's rail system

Finmeccanica owns all of AnsaldoBreda, which is unprofitable, and 40% of Ansaldo STS, which is profitable, according to the report. The two Ansaldo companies formed a joint venture, Ansaldo Honolulu JV, to design and build the 20-mile, 21-station elevated train system for Oahu under a $1.4 billion contract.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close