Rail

Alstom hybrid locomotives on course in Germany

Posted on September 23, 2010

[IMAGE]05-2.jpg[/IMAGE]DB Schenker Rail, the Mitteldeutsche Eisenbahngesellschaft (MEG) and Alstom signed an agreement on long-term testing of Alstom's hybrid shunting locomotives.

MEG, subsidiary company of DB Schenker Rail, will lease five hybrid locomotives from Alstom, with the option to purchase them at a later date. The hybrid locomotive, presented at Innotrans 2010, has been subjected to endurance tests since 2008 and these tests will be extended to another four locomotives by the end of 2011.

"We are pleased that our innovative concept of the hybrid locomotive enters the next phase. Alstom presented the prototype for the first time at Innotrans 2006. Today, we are starting the next round together with DB and MEG", said Klaus Hiller, head of the service and locomotives business at Alstom Transport Germany.

Hybrid technology, which can be used in all heavy shunting services, reduces fuel consumption by approximately 50 percent and is aimed at a Europe-wide market of several thousands of locomotives that are obsolete. With a top output of 600 kW, the locomotive has only a small diesel generator of 250 kW and draws the additional power from batteries that are recharged by the generator.

In pure battery operation, the locomotive is especially low in noise and vibrations, which is particularly advantageous for operation in tunnels or buildings. Thanks to its compact engine, it is also very silent when the generator is in operation.

In practice, the generator runs less than 50 percent of the service time while the large engine of conventional locomotives runs permanently and idles most of the time, according to Alstom.

View comments or post a comment on this story. (0 Comments)

More News

Alstom to provide Amtrak with new generation, high-speed train

Will run on the Northeast Corridor. Amtrak and Alstom also signed a long-term contract under which Alstom will provide Amtrak with long-term technical support and supply spare components and parts for the maintenance of the new trainsets.

Metra receives final Electric Highliners

Completes 2010's 160-car purchase to outfit the line with a completely new and modern fleet.

Amtrak's microgrid to serve as backup during power outages

In the aftermath of the 2012 Superstorm Sandy, half of the Sunnyside Yard had to rely on portable backup generators for a month due to a damaged transmission line.

Detroit's M-1 begins testing streetcar line

The slow-moving "speeder" vehicle will travel the rail line as part of a testing regimen that ensures the route is free of obstructions.

Honolulu's rail executive director/CEO resigns

Dan Grabauskas will be paid the final year of contract as part of the separation agreement, a total of $282,250. The board appointed HART board member Mike Formby as acting CEO, effective immediately.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close