Chicago continues 5000-series railcar testing

Posted on October 26, 2010

On Monday, the Chicago Transit Authority (CTA) began in-service testing of 5000-series prototype railcars on its Orange Line. The railcars are currently running on the Blue Line and had previously been tested on the Green and Red lines.

The 10 prototype railcars are being tested to determine how they perform when operating in the conditions that CTA's rail fleet is subjected to throughout the year. The prototypes must successfully complete testing on all eight rail lines before CTA will authorize the delivery of the remaining 396 rail cars.

Each car has seven networked security cameras, an event recorder system similar to a black box on an airplane and sensitive door sensors that will detect obstructions better than CTA's current rail fleet.

Meanwhile, the new aisle-facing seating configuration is designed to accommodate more customers per car and allow more room for customers carrying backpacks, packages, luggage, strollers and bikes. The configuration provides 38 seats and space for two wheelchair positions and added support poles and hand straps in the center of the car for standing customers.

Other amenities include: an LED station indicator map with lights that move in conjunction with the train's location and electronic destination signs — widened to increase the size of the text that improves readability — both inside and outside of the railcar; regenerative braking that returns braking energy to the third rail for reuse to help power other trains and on-board electrical systems; and an alternating current (AC) propulsion system that converts the direct current (DC) energy in the third rail to AC for the traction motors.


View comments or post a comment on this story. (0 Comments)

More News

Bombardier to supply 4 more trams to Australia

The order is valued at approximately $18 million and is an exercise of an option included in a contract signed in 2011.

Texas' DCTA receives grant for A-Train Rail Trail

Once complete, the Lewisville Hike and Bike trail will run from DCTA’s Hebron Station all the way to the Highland Village/Lewisville Lake Station. Construction on the last portion of the Lewisville Hike and Bike trail is expected to begin in early 2016.

Metra prepares for winter weather with switch covers, heaters

Additionally, agency is continuing to repair and replace railcar doors that are prone to fail in winter conditions.

Alstom to supply Citadis trams to Lyon, France

The order, worth over $21 million, represents the exercise of an option on a contract signed in 2011.

XpressWest chosen to build Las Vegas-to-L.A. high-speed rail

The initial phase of the XpressWest project, which will link Las Vegas to Victorville, Calif., will cost $8 billion.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment



Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close