Rail

Chicago continues 5000-series railcar testing

Posted on October 26, 2010

On Monday, the Chicago Transit Authority (CTA) began in-service testing of 5000-series prototype railcars on its Orange Line. The railcars are currently running on the Blue Line and had previously been tested on the Green and Red lines.

The 10 prototype railcars are being tested to determine how they perform when operating in the conditions that CTA's rail fleet is subjected to throughout the year. The prototypes must successfully complete testing on all eight rail lines before CTA will authorize the delivery of the remaining 396 rail cars.

Each car has seven networked security cameras, an event recorder system similar to a black box on an airplane and sensitive door sensors that will detect obstructions better than CTA's current rail fleet.

Meanwhile, the new aisle-facing seating configuration is designed to accommodate more customers per car and allow more room for customers carrying backpacks, packages, luggage, strollers and bikes. The configuration provides 38 seats and space for two wheelchair positions and added support poles and hand straps in the center of the car for standing customers.

Other amenities include: an LED station indicator map with lights that move in conjunction with the train's location and electronic destination signs — widened to increase the size of the text that improves readability — both inside and outside of the railcar; regenerative braking that returns braking energy to the third rail for reuse to help power other trains and on-board electrical systems; and an alternating current (AC) propulsion system that converts the direct current (DC) energy in the third rail to AC for the traction motors.

 

View comments or post a comment on this story. (0 Comments)

More News

Feds wants more proof of local money for Durham-Orange light rail line

Go Triangle expects its Board of Trustees to vote April 26 on a $70 million engineering contract, which would be executed only after the FTA allows the project to advance.

SEPTA trains collide, injuring 4

Crews are still working to remove the 18 cars involved, with each car weighing about 37 tons. The NTSB is on the scene and fully in charge of the investigation.

Minn. legislators attempting to move $900M from rail to roads, bridges

GOP legislators have long sought to block planning and funding for light-rail projects, saying they put metro-area priorities above rural Minnesota.

Alstom secures $105M Australian trainset contract

The contract will expand PTV’s fleet to 101 trains (606 cars) delivered from Alstom’s manufacturing facility in Ballarat since 2002.

DC Streetcar fares to remain free

The decision to hold off on charging fares was based on two reasons — District Department of Transportation feared charging even $1 per ride would scare away passengers and charging a fare would actually cost the District money.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close