Rail

N.C. DOT begins rail upgrade program

Posted on March 24, 2011

Gov. Bev Perdue announced Tuesday that the North Carolina Department of Transportation reached an agreement with Norfolk Southern Railway Co., Amtrak and N.C. Railroad Co. that allows construction to begin on the state’s rail modernization program, bringing more than 4,000 jobs to the state in the short run and boosting economic activity over the longer term.

"Rail is a critical component in North Carolina's economic development infrastructure," Perdue said. "Improving speed and efficiency for both passenger and freight services demonstrates our commitment to the future."

The agreement, approved by the Federal Railroad Administration, triggers the release of $461 million in 100 percent federal funds from the American Recovery and Reinvestment Act (ARRA), which will pay for upgrades to tracks between Raleigh and Charlotte; bridges and crossing safety improvements; station expansions in four cities along that path; and construction of a maintenance facility in Charlotte.

The funding also will enable North Carolina to improve the speed and reliability of passenger service, add a fourth daily round trip between Charlotte and Raleigh in coming years and refurbish locomotives and railcars.

The state will proceed with 24 construction projects in 11 counties, ranging from adding double tracks between Charlotte and Greensboro to building a dozen new bridges to eliminate 30 at-grade highway crossings.


North Carolina was awarded $545 million in grant funds last year from the federal government. Norfolk Southern leases the line between Raleigh and Charlotte from the state-owned NC Railroad Co.

Under the agreement, North Carolina will work with Norfolk Southern to design and construct the rail improvements.

North Carolina already had received $59 million of the ARRA grants and put it to use adding a third daily round trip; purchasing equipment; upgrading stations in Cary, Burlington, High Point and Kannapolis; and planning for the next stage of construction.

In addition to increasing passenger rail capacity, the rail network improvements are designed to enhance safety, improve service reliability and preserve existing freight capacity.

View comments or post a comment on this story. (0 Comments)

More News

Chicago Transit replacing airport escalator damaged in train wreck

The train wreck, which occurred in the early morning of March 24, 2014, when the operator allegedly fell asleep, injured more than 30 people and caused roughly $9 million in damage. The lead railcar had to be cut up to remove it from the escalator.

DART takes delivery of first streetcar for new service

The vehicle, which was a designed and built by Brookville Equipment Corp., will be the first streetcar in the U.S. that utilizes wireless traction power.

NJ TRANSIT marks Newark Penn Station's 80th year

Opened in 1935, Newark Penn Station is listed on both the State and National Registers of Historic Places. The station was originally designed and still operates as an intermodal facility serving pedestrian, taxi, bus and private vehicle traffic generated by the more than 50,000 transit customers who use the station each day.

Calgary Transit trains, buses breaking down more often

Part of the problem is an aging fleet, according to officials. Calgary Transit placed a $200-million deal in 2013 to buy 60 new light rail vehicles; however, those vehicles will not be operational until 2016.

Alstom to develop zero-emission train

The new trains for Hermann-Hesse railway line will be completely emission-free. In times of increasing energy costs and higher level of pollution, the development of this technology is essential.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close