Rail

BART upgrades mobile website

Posted on May 12, 2011

Oakland, Calif.-based Bay Area Rapid Transit District (BART) riders can now find improved real-time departure information and location-based walking and bicycling directions on BART’s redesigned mobile website — m.bart.gov.

The new version of the site, which was “soft launched” one month ago, will better accommodate the growing number of riders seeking BART information on the go.

"Last year we saw our mobile website traffic double to more than two million visits," Website Manager Timothy Moore said. "Add the additional 1.8 million visits to our regular website using mobile devices and we saw a great opportunity to improve BART services for a huge number of people."

Now on BART’s mobile website, riders with GPS-enabled phones can find the closest station to their current location and use the BART QuickPlanner to plan a trip based on their current location. The QuickPlanner also features new maps with walking, bicycling or driving directions.

BART’s mobile website also offers:

•    Expanded real-time departure information including bike blackouts, car length, line color and Muni ETDs for shared stations in San Francisco.

•    Information about parking, bicycles, connecting transit and other neighborhood details for each of the BART system's 44 stations.

•    BART service advisories, elevator advisories and other BART news.

•    A carbon calculator on the BART QuickPlanner that tells you how much CO2 you will save by taking transit on your trip instead of driving.

Since 2004, BART has offered a mobile website optimized for traditional phones, and that site will continue to be available at www.bart.gov/wireless. BART also offers email and SMS alerts or on-demand SMS updates for riders not on the mobile web.

View comments or post a comment on this story. (0 Comments)

More News

Calif.'s Metrolink puts PTC into revenue service demo mode

With this latest accomplishment, Metrolink remains on track to become the nation’s first passenger rail system to have a fully implemented, interoperable PTC system in place.

Alstom to supply signalling, infrastructure for Cairo metro line

The company’s shares in these contracts are worth around $90 million.

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

Alstom to deliver to Sydney Citadis X05

Company is responsible for the integrated tramway system, which includes the design, delivery and commissioning of 30 coupled Citadis X05 trams; power supply equipment, including APS -ground power supply; signaling systems, the energy recovery system HESOP, depot equipment and maintenance.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close