Rail

SEPTA debuts $1.1M eco-friendly transit station

Posted on May 23, 2011

[IMAGE]SEPTA-Fox-Chase-Station-May-24-2011-2.jpg[/IMAGE] Last week, Southeastern Pennsylvania Transportation Authority (SEPTA) representatives and elected officials joined residents of Philadelphia's Fox Chase neighborhood to celebrate the authority's rebuilt Fox Chase train station at a ribbon cutting ceremony.

[IMAGE]SEPTA-Ribbon-Cutting-May-24-2011-2.jpg[/IMAGE] The new station building, which includes energy-efficient HVAC and lighting systems, is eligible for a Leadership in Energy and Environmental Design (LEED) Silver-designation.

The United States Green Building Council's (USGBC) LEED certification system recognizes the environmental impact of new building and major renovation projects. The USGBC awards points to projects for the types of materials used, energy efficiency, waste recycling and other ecofriendly construction practices. LEED ratings are "Certified," "Silver," "Gold" and "Platinum." Fox Chase Station is eligible for Silver certification in USGBC's "New Construction" category.

"We are proud not only to provide the members of the Fox Chase community with a rebuilt station, but also with environmentally-friendly designed train station," said SEPTA GM Joseph Casey. "Fox Chase Station's LEED eligibility is another example of how 'green' public transportation is."

Renovations at Fox Chase Station — the terminus of SEPTA's Fox Chase Regional Rail Line — began in fall 2009 and cost $1.1 million dollars, funded by the American Recovery and Reinvestment Act (ARRA).

In addition to demolishing and rebuilding the station building, renovations at Fox Chase included demolition and removal of parts of existing platform, ramps, railings and benches; installation of Americans with Disabilities Act (ADA)-compliant ramps and railings; construction of new canopies and reworking parts of station platform.

The station remained open throughout the construction period.

 

View comments or post a comment on this story. (0 Comments)

More News

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

Alstom to deliver to Sydney Citadis X05

Company is responsible for the integrated tramway system, which includes the design, delivery and commissioning of 30 coupled Citadis X05 trams; power supply equipment, including APS -ground power supply; signaling systems, the energy recovery system HESOP, depot equipment and maintenance.

Ann Arbor transit official urged MDOT not to lease railcars

In 2009, more than a year before MDOT signed a contract to lease and refurbish the double-decker railcars, which since have cost the state about $12 million, an Ann Arbor transit official told MDOT the cars were not suitable for proposed commuter rail services because they didn't meet federal requirements.

Hitachi purchases manufacturer of Honolulu's rail system

Finmeccanica owns all of AnsaldoBreda, which is unprofitable, and 40% of Ansaldo STS, which is profitable, according to the report. The two Ansaldo companies formed a joint venture, Ansaldo Honolulu JV, to design and build the 20-mile, 21-station elevated train system for Oahu under a $1.4 billion contract.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close