Rail

Metrolink receives $46M for positive train control

Posted on August 18, 2011

[IMAGE]Metrolink2-screenshot-2.jpg[/IMAGE]Southern California's Metrolink plans to implement positive train control (PTC) ahead of the federal mandate received a boost when the agency received $46.3 million dollars in funds to support the installation of the new rail safety technology.

PTC is collision avoidance technology that monitors and controls train movements remotely and can prevent train-to-train collisions, unauthorized train movement into a work-zone, movement of a train through a switch left in the wrong position and trains exceeding authorized speeds.

PTC implementation is mandated for all rail providers by 2015 by the federal Rail Safety Improvement Act.

The California Transportation Commission allocated $22.8 million in Proposition 1A High Speed Rail Passenger Train bonds and $10 million in Proposition 1B State and Local Partnership Program funds to advance the agency's PTC implementation program. Additionally, the Federal Railroad Administration awarded a $13.5 grant to Metrolink to fund a segment of the program that supports the Pacific Surfliner, located between San Onofre and Moorpark.

 VIDEO: Click here, to see Metrolink's positive train control program in action.

View comments or post a comment on this story. (0 Comments)

More News

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

Alstom to deliver to Sydney Citadis X05

Company is responsible for the integrated tramway system, which includes the design, delivery and commissioning of 30 coupled Citadis X05 trams; power supply equipment, including APS -ground power supply; signaling systems, the energy recovery system HESOP, depot equipment and maintenance.

Ann Arbor transit official urged MDOT not to lease railcars

In 2009, more than a year before MDOT signed a contract to lease and refurbish the double-decker railcars, which since have cost the state about $12 million, an Ann Arbor transit official told MDOT the cars were not suitable for proposed commuter rail services because they didn't meet federal requirements.

Hitachi purchases manufacturer of Honolulu's rail system

Finmeccanica owns all of AnsaldoBreda, which is unprofitable, and 40% of Ansaldo STS, which is profitable, according to the report. The two Ansaldo companies formed a joint venture, Ansaldo Honolulu JV, to design and build the 20-mile, 21-station elevated train system for Oahu under a $1.4 billion contract.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close