Rail

Experts approve Calif. high-speed rail ridership data

Posted on September 7, 2011

A peer review panel concluded that the model and data used for ridership and revenue forecasts for high-speed rail in California provides a solid foundation for project planning.

"We are satisfied with the documentation presented in Cambridge Systematics and conclude that it demonstrates that the model produces results that are reasonable and within expected ranges for the current environmental planning and Business Plan applications of the model," peer reviewers wrote in their report, provided to the California High-Speed Rail Authority last week. "We were very pleased with the content, quality and quantity of the information."

The authority convened the peer review panel earlier this year to examine the ridership and revenue forecasting process used by Cambridge Systematics to produce the estimates used in planning and environmental work. This was in direct response to calls from observers for a more in-depth review of the approach Cambridge Systematics used to arrive at its ridership forecasts.

"The peer review report clearly indicates that the ridership model is a useful and dynamic tool," said the authority's CEO Roelof van Ark. "We will continue to refine the model and add the latest data to forecast demand for the state's high-speed rail system."

The ridership model has been used for planning the state's high-speed rail system. One of its first major uses was estimating the ridership for the full system so that planners could determine the largest possible impacts that would require mitigation. A practical range of updated ridership forecasts reflecting new data will be included in the authority's upcoming October business plan.

The report concluded that the model is appropriate for its intended uses, will provide a sound basis for future forecasting needs and will continue to be improved to support more detailed analyses.

The authority has been working with Cambridge Systematics to use and refine the model as part of its project level environmental review, business planning and system development. Further enhancements to the model will continue over the coming years as the high-speed rail project progresses.

To view the full report, click here.

 

 

View comments or post a comment on this story. (0 Comments)

More News

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

Alstom to deliver to Sydney Citadis X05

Company is responsible for the integrated tramway system, which includes the design, delivery and commissioning of 30 coupled Citadis X05 trams; power supply equipment, including APS -ground power supply; signaling systems, the energy recovery system HESOP, depot equipment and maintenance.

Ann Arbor transit official urged MDOT not to lease railcars

In 2009, more than a year before MDOT signed a contract to lease and refurbish the double-decker railcars, which since have cost the state about $12 million, an Ann Arbor transit official told MDOT the cars were not suitable for proposed commuter rail services because they didn't meet federal requirements.

Hitachi purchases manufacturer of Honolulu's rail system

Finmeccanica owns all of AnsaldoBreda, which is unprofitable, and 40% of Ansaldo STS, which is profitable, according to the report. The two Ansaldo companies formed a joint venture, Ansaldo Honolulu JV, to design and build the 20-mile, 21-station elevated train system for Oahu under a $1.4 billion contract.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close