Rail

PB to manage New Orleans RTA streetcar construction

Posted on September 8, 2011

The New Orleans Regional Transit Authority (RTA) awarded a contract to Parsons Brinckerhoff (PB) for construction management services for the expansion of the city's streetcar system.

In 2010, the RTA received a $45 million TIGER (Transportation Investment Generating Economic Recovery) grant from the U.S. Department of Transportation to build a streetcar loop on Loyola Avenue from Canal Street to the Union Passenger Terminal (UPT), a 1.4-mile route through the central business district. RTA subsequently sold approximately $80 million in revenue bonds in 2010 to fund the French Quarter Loop Streetcar expansion as well.

PB will serve as the RTA's construction manager for the three-phase expansion project — Loyola Avenue from Canal Street to UPT (phase 1); the French Quarter Loop expansion (phase 2, based on budget availability); and the Riverfront/Convention Center expansion (phase 3).

The PB team will be responsible for providing construction management and support staff throughout the construction and close-out phases. The firm will also monitor and control project schedule and budget.

Construction on the first phase of the streetcar expansion will begin in August 2011, with completion slated for June 2012.

View comments or post a comment on this story. (0 Comments)

More News

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

Alstom to deliver to Sydney Citadis X05

Company is responsible for the integrated tramway system, which includes the design, delivery and commissioning of 30 coupled Citadis X05 trams; power supply equipment, including APS -ground power supply; signaling systems, the energy recovery system HESOP, depot equipment and maintenance.

Ann Arbor transit official urged MDOT not to lease railcars

In 2009, more than a year before MDOT signed a contract to lease and refurbish the double-decker railcars, which since have cost the state about $12 million, an Ann Arbor transit official told MDOT the cars were not suitable for proposed commuter rail services because they didn't meet federal requirements.

Hitachi purchases manufacturer of Honolulu's rail system

Finmeccanica owns all of AnsaldoBreda, which is unprofitable, and 40% of Ansaldo STS, which is profitable, according to the report. The two Ansaldo companies formed a joint venture, Ansaldo Honolulu JV, to design and build the 20-mile, 21-station elevated train system for Oahu under a $1.4 billion contract.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close