Rail

Feds award $19.4M in rail relocation funds

Posted on September 15, 2011

Eight cities and states will share $19.4 million to replace, relocate and improve segments of railroad track in order to enhance safety, livability, and economic development. The Federal Railroad Administration (FRA) received 51 applications from across the country for the Rail Line Relocation and Improvement (RLR) grants, seeking more than $202 million.

FRA's RLR Grant Program assists projects that improve community livability and promote economic development by addressing the effects of rail traffic on safety, roadway and pedestrian traffic, overall quality of life and local area commerce. Funding for these grants is made available through annual appropriations and requires a 10 percent contribution from the project sponsor.

In September, as part of the Rail Line Relocation Grant Program, FRA will issue a Notice of Funding Availability (NOFA) for more than $11.5 million (made available through annual appropriations), with applications due 30 days later. The notice will be published on the FRA's website and available through the Federal Register later this month.

Rail line relocation dollars announced today will fund the following projects:

  • Port of San Francisco, California - Quint Street Yard Track and Signal Improvements - $2,970,000 to improve an approximately one mile-long spur connecting a Caltrain mainline track to the San Francisco Rail Yard. The mainline is under consideration for use as part of the California high-speed rail project, and the current condition of the spur track limits the frequency, weight and length of trains that can use the track, causing delays. The improvements will allow freight trains to operate at higher speeds and clear the mainline more quickly, significantly reducing delays to Caltrain commuter trains and future high-speed rail trains.
  • Sprague, Connecticut - Providence & Worcester Railroad Willimantic Branch - $5,302,900 to upgrade track on the Providence and Worcester Railroad Company's Willimantic Branch, allowing freight operations to increase speed from 10 mph to 40 mph. Located in a rural section of east central Connecticut, the Willimantic Branch serves local shippers, and improvements will provide for more efficient movement of freight shipments originating from or destined to customers across the nation or overseas.
  • Maryland Department of Transportation- Canton Area Rail Improvement Project, $1,742,240 for the expansion of a Canton Railroad Company yard facility. The short line railroad serves industrial customers in and around the Port of Baltimore. Current switching operations often cause major motor vehicle traffic delays, requiring traffic to be rerouted around the yard. The improvements will permit more efficient switching operations, and create additional car storage, which will help reduce traffic congestion.
  • Tavares, Florida - Florida Central Railroad Upgrade and Rehabilitation, $2,200,000 to upgrade a segment of track on the Florida Central Railroad in Lake and Orange counties, allowing increases in speed from 10 mph to 40 mph. Coupled with additional track and bridge repairs, freight service can be restored to areas currently not served by rail. The improvements may also benefit potential future SunRail commuter service and an excursion train service between Orlando and the City of Mt. Dora.
  • Minnesota Department of Transportation - K-Line Rail Improvement Project, $1,469,556 to improve and extend a municipally-owned rail spur. The line connects to an industrial park in the City of Wadena, where last year, tornados caused severe damage to local homes and businesses. Extending the track will enable a local shipper, whose current location forces it to route traffic close to a high school, to relocate its operations to the industrial park.
  • Arkansas State Highway and Transportation Department - Arkansas Midland Railroad/Warren Branch, $2,721,435 to rehabilitate and improve 40 miles of track along the Warren Branch of the Arkansas Midland Railroad, a short line railroad located in the Arkansas Delta. The planned improvements will remedy poor track conditions caused by inadequate drainage and heavy freight loads, which have contributed to washouts, broken rails, derailments and slow orders that reduce train speeds.
  • Springfield, Missouri - West Wye Connection Track, $1,898,444 to relocate an existing "Wye" track (a triangular junction utilized for rail switching and turning) that runs through the center of Springfield to the western side of the city. The project will enable the permanent removal of 23 highway-rail grade crossings, increasing roadway safety in the area while improving railroad operational performance.
  • Alaska Railroad - Milepost 142 Curve Alignment, $1,141,840 to reduce the curvature of the Alaska Railroad mainline adjacent to the Native Village of Eklutna. The realignment and improvements will increase track speeds, reduce noise and improve operating safety and efficiency. A new access road will also allow vehicles to access trains for inspection and car repair, and provide Eklutna Inc. tribal members access to their property.

 

 

View comments or post a comment on this story. (0 Comments)

More News

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

Alstom to deliver to Sydney Citadis X05

Company is responsible for the integrated tramway system, which includes the design, delivery and commissioning of 30 coupled Citadis X05 trams; power supply equipment, including APS -ground power supply; signaling systems, the energy recovery system HESOP, depot equipment and maintenance.

Ann Arbor transit official urged MDOT not to lease railcars

In 2009, more than a year before MDOT signed a contract to lease and refurbish the double-decker railcars, which since have cost the state about $12 million, an Ann Arbor transit official told MDOT the cars were not suitable for proposed commuter rail services because they didn't meet federal requirements.

Hitachi purchases manufacturer of Honolulu's rail system

Finmeccanica owns all of AnsaldoBreda, which is unprofitable, and 40% of Ansaldo STS, which is profitable, according to the report. The two Ansaldo companies formed a joint venture, Ansaldo Honolulu JV, to design and build the 20-mile, 21-station elevated train system for Oahu under a $1.4 billion contract.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close