Rail

LaHood, Rogoff visit Minnesota rail project

Posted on September 19, 2011

U.S. Transportation Secretary Ray LaHood and Federal Transit Administrator Peter Rogoff visited Minnesota on Monday in support of President Obama's American Jobs Act and called on Congress to make significant investments in job-creating transportation projects like the currently underway Central Corridor Light Rail project.

LaHood and Rogoff visited the historic Union Depot Station in downtown St. Paul, which is currently under construction as part of the new Central Corridor Light Rail Line. Construction of the line is expected to generate more than 3,300 jobs, including positions related to engineering, design, construction and operations.

The line includes 18 new stations, 31 new railcars and a new vehicle maintenance facility in St. Paul. It is scheduled to open in 2014.

In April 2011, Administrator Rogoff signed a Full Funding Grant Agreement to provide $474 million in New Starts funds for construction of the 11-mile light rail project that will link the downtowns of Minneapolis and St. Paul. The total cost of the project is $957 million.

In addition to the Central Corridor Light Rail Line, federal funds helped create more than 225 jobs between July and November of this year alone for construction of the Union Depot Multi-Modal Transportation Hub. When completed, the facility will accommodate Amtrak, regional transit buses and intercity buses, and provide easy access to the light rail line.

More than half of the $243 million multi-modal facility is being paid for with a combination of federal funds, including the Federal Highway Administration, Federal Transit Administration, Federal Railroad Administration and $35 million from the U.S. DOT's Transportation Investment Generating Economic Recovery (TIGER) grant program.

 

View comments or post a comment on this story. (0 Comments)

More News

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

Alstom to deliver to Sydney Citadis X05

Company is responsible for the integrated tramway system, which includes the design, delivery and commissioning of 30 coupled Citadis X05 trams; power supply equipment, including APS -ground power supply; signaling systems, the energy recovery system HESOP, depot equipment and maintenance.

Ann Arbor transit official urged MDOT not to lease railcars

In 2009, more than a year before MDOT signed a contract to lease and refurbish the double-decker railcars, which since have cost the state about $12 million, an Ann Arbor transit official told MDOT the cars were not suitable for proposed commuter rail services because they didn't meet federal requirements.

Hitachi purchases manufacturer of Honolulu's rail system

Finmeccanica owns all of AnsaldoBreda, which is unprofitable, and 40% of Ansaldo STS, which is profitable, according to the report. The two Ansaldo companies formed a joint venture, Ansaldo Honolulu JV, to design and build the 20-mile, 21-station elevated train system for Oahu under a $1.4 billion contract.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close